I had planned on being up and going for a rid eon the first passenger train across the new bridge, but that did't quite happen what with my bout of "lazy-bone-itis"

Thanks for the video. Might go and get a day tripper ticket in the next couple of days and traverse it a couple of times enroute to various destinations.

Assuming you can still get the "Daytripper" tickets now that First don't run the services.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Many thanks. And you can just see the pantograph so we know the wires are working!
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,425
Location
Salt & Vinegar
I had planned on being up and going for a rid eon the first passenger train across the new bridge, but that did't quite happen what with my bout of "lazy-bone-itis"

Thanks for the video. Might go and get a day tripper ticket in the next couple of days and traverse it a couple of times enroute to various destinations.

Assuming you can still get the "Daytripper" tickets now that First don't run the services.

"Daytripper" is an SPT product so is unaffected by the franchise change.

Assuming you were just wanting to try out the new bridge a few times worth remembering the Whifflet line is wholly within the "Roundabout" validity area, saving a few quid:
http://www.spt.co.uk/travelcards/day-tickets/
 

onionjoe76

Member
Joined
15 Feb 2011
Messages
58
"Daytripper" is an SPT product so is unaffected by the franchise change.

Assuming you were just wanting to try out the new bridge a few times worth remembering the Whifflet line is wholly within the "Roundabout" validity area, saving a few quid:
http://www.spt.co.uk/travelcards/day-tickets/

Ah right, thanks for that info. I will look in to the are covered by the "roundabout". I fancy a wee day travelling all over the network including over to the various stations on the west coast and up to Balloch etc. Of course, I'd prefer a sunny day so could be waiting a while.
 

Scotrail88

Member
Joined
21 Jul 2014
Messages
454
Looks like a speed restriction on the bridge as services going very slow over the new bridge
Anybody know the details and how long this will be in place for
 

dbmbridges

Member
Joined
13 Sep 2014
Messages
18
Really Fantastic - time lapse video showing the bridge being driven in with SPMT's.

I was part of the team did the bridge on the A46 - a very similar project -
http://www.dbmbridges.com/Project-3-Bingham-Railway-Bridge.php

It's interesting that it seems to be called a bridge slide on the BBC news - this is technically incorrect as the bridge is driven into place. Originally the A46 bridge was going to be slid into place on slide track rails and jacked over into position - i had a real battle to get it changed to SPMT's - especially as we only had 83hrs to install the bridge.

I am working on a bridge Drive (week 30) in Derbyshire - this one the is only 100t (where as Bingham was close to 1200t) - the planning these days is just phenomenal - so fair play to the team that did the new Bargeddie Bridge. :D
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,411
Location
Glasgow
Before we get any 'SPMT' jokes:
http://www.mammoet.com/en/Equipment/Transport/SPMT
Self-propelled modular transporter
The self-propelled modular transporter (SPMT) is a platform vehicle with modules of four, five or six axle lines. The modules can be connected to multi-wheel transporters to transport a load that is too big or too heavy for a truck or low-loader. The SPMT can rotate around its center to make a 360° turn (carrousel) and can move sideways. Each SPMT axle can carry up to 40 metric tonnes, including its own weight. The modules fit on a normal truck. A separate power pack drives the (connected) module(s) and supplies hydraulic pressure for the steering, driving and height adjustment of the modules.

I knew that :) but only after encountering them recently.

Thanks for that post dbmbridges. Interesting that the people on site at Bargeddie were referring to a 'slide' as well when I spoke to them, though Mammoet must have been booked for the job by then.
 