It's a common occurrence because there are only two of them for two diagrams. They really need a spare one to live at Bletchley.
Both units running together isn't common. the 153 broke down at Ridgmont and had to be rescued by the 150
It's a common occurrence because there are only two of them for two diagrams. They really need a spare one to live at Bletchley.
It's that one. But it is unacceptable - reliability of the line is appalling at present. Another option needs to be found urgently - D-trains might be a good option to allow a spare to be obtained cheaply enough.
East West Rail will provide an end solution by way of a complete recast of the service and stock, of course.
Even without East West Rail there would be a good argument to wire it just to get rid of the island of diesel operation, then a 319 could be used (and in the event of disruption on the WCML/MML that would mean far better contingencies could be operated).
I use the line daily (except Sunday when we have no service) and cancellations & failures haven't been been that common recently as we have been on a really good run of reliability. The last fortnight has seen that decline.
LM don't have capacity for a spare unit. It would sit in the carriage sidings most weeks without doing anything.In any event one of the 150's has gone to Doncaster so there is even less slack.
We have a fitter at Bletchley who tends to the recalcitrant units and does a bloody good job kicking them back into life on a regular basis. It is no surprise reliability went up when he started being based down here. Before he came failure was a common occurrence now it is an exception.
IN fairness one afternoon last week one of the units burst and LM scrambled a replacement 153 off a service at New Street and ran it ECS down the WCML and into P5 at Bletchley in time to run the 1736. It came of a service train and meant capacity was reduced in Brum. It wasn't off spare.
I don't believe that E-W will make much if any difference to those of us using the stopping service along the Vale - I still see it as diesel powered hourly service. There is a risk the work on E-W between Bedford & Bletchley wont happen and it certainly wont be wired up as stand alone route
I agree with everything that you have said, but unfortunately allot of what you are saying is in the future and there is something that needs to be done now, and the only thing that i can think of is have a bus company ready to provide adequate cover when the service falls to pieces.
There is! LM control tend to have it rolling quite quickly. I have had a taxi called by the ticket office to get me home.