But you would still have a 45min service unless a passing loop as The Planner says. The line can only survive if patronage rises. A loop at Bricket Wood (think Penrhyn style) looks like the best solution, would allow a 30 min service, (possible squeezing it down to a 20 min service in the peak. If the passengers cvome, then maybe the other things could follow. As it is the line will just drift on like a longer version of the Romford-Upminster operation.
...as I said previously, the drastic options only make sense once the line already has at least 2tph (if not 3tph or so), so I suspect we're actually in slight agreement.
The line is 16 minutes end to end. That means with a 0-minute turnaround it's 32 minutes to get there and back. Add in a rough 5 minute turnaround at each end and you get the magic 42 minute figure with a few minutes of slack. Do away with the turnaround at Watford (i.e. as a through service) and you get down to 37 minutes to do Watford-St Albans-Watford. Without a loop you could have two units on the line, but have one wait in the platform at St Albans so it can be released as soon as the next train arrives into the other platform, and you would then get it down to the base 32 minutes, abet you end up with stock sitting idle longer at St Albans than if you built the passing loop.
I suspect if you operated metro-style stock with better acceleration (read: LO 378s), then you would be able to shave a few more minutes off as well, getting you below the magic 30 minute mark.
Last edited: