Possibly. But looks like the whole service was canceled rather than part of it.
Looks like there was a bus replacement on Saturday as well, did this happen Friday night/early Saturday morning and I only just noticed? Then again, no train with the code 6Y31 ran through the area on Friday or Saturday morning either, so I'm stumped.
The link posted earlier in the thread looks like a WTT coal schedule that has been cancelled off using the wrong delay code.
6Y31 arrived at site 2236 on Saturday evening (04 July). Due to the way possessions are planned the schedule for arrival/departure will be at the possession limits normally, rather than reflecting their final position in the worksite(s).
The train was due to depart at 1900 (origin Moothorpe) on Sunday evening (05 July) but was cancelled off following the derailment earlier in the evening.
As a result the work overran (further than originally forecast after engineering issues following, and unrelated to, the rerailing operation) beyond the planned Monday AM handback. Line was returned Monday (06 July) afternoon with a 50mph TSR, further tamping taking place as part of an additional possession Monday into Tuesday.