The Snap
Established Member
- Joined
- 10 Jun 2005
- Messages
- 3,156
Pretty much what the title says. Any chance of them heading north? Would be nice to see some nearly-new cast-offs rather than 30 year old cast-offs in the North!
Northern bidders were allowed to propose taking any 15xs or 17xs which will be released.
That included:
The FGW 150/1s and 153s
Some of the Scotrail 156s, 158s and 170s
The LO 172s
As Arriva and Govia were shorlisted bidders it's possible that they have proposed plans for Northern to benefit from the release of 172s but not to take them on. For example, Govia might have said if LM take on the 172s that allow LM 170s to be released to Northern, while Arriva could have proposed Chiltern taking on some Scotrail 170s converting them to 168s and letting Northern have both the Chiltern and LO 172s for a consistent fleet at Chiltern.
At the moment it is expected Northern will take on cascaded Turbostars in the form of 170s from Scotrail and will also order brand new diesel trains, which are expected to be Bombardier built.
I assume the 170s and new stock to Northern forms part of the new Northern franchise conditions for the new franchise next year?
I think they're already spoken for at Chiltern
I think they're already spoken for at Chiltern only by posters in rail forums who like to see order everywhere...
Can we find something official that suggests it?
They're spoken for in that whenever any DMU becomes available it seems to go to Chiltern.
They're spoken for in that whenever any DMU becomes available it seems to go to Chiltern.
actually its Gospel oak Barking line improvement now!For the benefit of the uninitiated, GOBLIN = Gospel Oak to Barking Line
Isn't Google wonderful.
Except those that go to Southern
Apparently they only swooped for the Scotrail 170s because Chiltern had already secured the TPE 170s, even though TPE thought the 170s were staying with them and the subsequent TPE operator until December 2018.
So we can expect Chiltern to take on the 144s when Northern release them then?
I doubt that Chiltern will have any use for them in 10 years time so, No. Until then I expect them to be still required in the north.
Are the TPE Class 170/3s in any better condition than the ex-Scotrail Class 170/4s?
They have to be released by Northern by December 2019 and the point is Chiltern are unlikely to want them just because they are off-lease DMUs.
If you're going to come up 'what if' scenarios which might change the franchise spec, what about if Northern actually sign leases for units which are expected to be released by FGW electrification and an electrification delay doesn't allow those units to be released on time? We could finish up with Northern taking the trains they've agreed deals for and other operators having to take on either Pacers or loco-hauled as replacement as nothing else is available.
actually its Gospel oak Barking line improvement now!

Putting the coded words in a tender document that Pacers must be replaced
05.06.15
Perry confirms Barking to Gospel Oak electrification timeline
Rail minister Claire Perry MP has confirmed that enabling works start in October on the £115m Gospel Oak to Barking electrification programme.
Responding to a Parliamentary question on the start date and cost from Labour’s Jeremy Corbyn, MP for Islington North, Perry added that the DfT and TfL have allocated £90m and £25m respectively towards the electrification of the line (2013 prices).
Corbyn was also told that “major on-site works” are due to commence in June 2016, with passenger services on the route due to be available for use by passenger operators by June 2017.
GRIP 3 (option selection) was completed in March this year, work having begun on it in 2013, according to TfL Transport Commissioner Sir Peter Hendy.
Glenn Wallis, secretary of BGORUG, said: “Our expert rail industry advisers tell us that for Network Rail to have taken three years to complete GRIP 3 indicates that they have not exactly been throwing resources at the job. The likelihood of Network Rail completing electrification of the line by mid-2017 is now said to be improbable.”
I wouldn't hold your breath for these units, NR have got to get their act together and electrify the line first.
Ah but that was a code for electrification pause. Saying an order of at least 120 new self-powered vehicles is required was a change in DfT policy. They'd been going on about electrification and cascades replacing Pacers but in the Northern ITT they effectively admitted electrification wouldn't be enough to replace the Pacers in time. The cost of 120 new carriages will be a fraction of what TPE electrification will have costed and it will probably impress Northerners more.
The next clue was in the TPE ITT where it suggested TPE electrification would be at least 2 years behind schedule and bidders needed to plan for electrification not being completed until after the end of the next franchise.
Also that cost - £115 mn for about 37 single-track km, over £3mn /km. MML electrification was 1.3 bn for 639 single-track km, just over £2mn /km, including resignalling, remodelling and other upgrades. The new EMUs for the Goblin are a piffling £46 mn for comparison. How much does a DMU have to cost for this to look the better option?
The problem with having new DMU's, is that in recent years diesel fumes have been found to be almost as polluting to global warming as petrol engines and in fact some of the newer petrol engines in recent years give off less fumes than diesel engines plus do more miles than the nearest diesel engine.
For me any new trains need to be hybrid to be honest such that they can be powered by either diesel or if possible battery cells as much as possible away from any mains electrification, but can be powered to say 100mph at a third of the power drawn from the mains whether it is AC or DC than current electric trains.
the high cost per km is because it consists almost entirely of tricky spots- little in the way of simple plain line
I don't disagree, and my preference would be for no new diesels and a rolling electrification programme. There's also freight on the Goblin, but much of that will remain diesel-hauled due to logistics and lack of wires throughout, and there's alternative paths through Stratford for the electrics.
Also that cost - £115 mn for about 37 single-track km, over £3mn /km. MML electrification was 1.3 bn for 639 single-track km, just over £2mn /km, including resignalling, remodelling and other upgrades. The new EMUs for the Goblin are a piffling £46 mn for comparison. How much does a DMU have to cost for this to look the better option?
I'm unconvinced that hybrid/bi-mode is yet suited to commuter stock, it's fairly tricky to get an AC EMU into 3 cars
I say that everything has changed since the election and nothing is set in concrete with politicians, especially in a government that has just unexpectedly gained a clear majority.