FusionRail
Member
Another bout of news from the bowels of the Not Very Reliable, the new attraction, which is my 1993 built 2-man petrol Alumicart, built by R Bance of Surrey.
Found dumped in a forest, miles from any railway, obviously lying there for years getting battered by chavs etc, i decided to take it to the NVR for a rebuild. Coming along nicely, now has a 5.5hp engine and 4:1 reduction chain drive. a 12v 110Ah battery powers its two 60 headlamps, 25w rear marker and two noisy horns. Also a trailer supply plug will be built in to power lighting on a trailer, and the civil's trolley we have acquired is being overhauled so that one half will have a seat and a 2kW generator, for site power etc, and the other half for tools etc.
Currently waiting on the axle wheel thread to be re-tapped, and a new brake. Future additions will include a 12v cigarette lighter and a CB radio for comms with the rest of the railway.
Pictures so far (in no order) and some even star Reece Bolton: http://fusion-rail.fotopic.net/c1501283.html
Found dumped in a forest, miles from any railway, obviously lying there for years getting battered by chavs etc, i decided to take it to the NVR for a rebuild. Coming along nicely, now has a 5.5hp engine and 4:1 reduction chain drive. a 12v 110Ah battery powers its two 60 headlamps, 25w rear marker and two noisy horns. Also a trailer supply plug will be built in to power lighting on a trailer, and the civil's trolley we have acquired is being overhauled so that one half will have a seat and a 2kW generator, for site power etc, and the other half for tools etc.
Currently waiting on the axle wheel thread to be re-tapped, and a new brake. Future additions will include a 12v cigarette lighter and a CB radio for comms with the rest of the railway.
Pictures so far (in no order) and some even star Reece Bolton: http://fusion-rail.fotopic.net/c1501283.html