Xenophon PCDGS
Veteran Member
In the meantime, has any updated technical news been "leaked" about the unit that is currently being prepared for trial evaluation purposes.
Vivarail said:Day to day operations are under the control of General Manager Steve Rowell. He said, Ive worked on projects like this before at Tyne and Wear Metro but the D-train is something else. The design specification is incredibly high and the timescale tight, to say the least. But in just six weeks we have dismantled the interiors, appointed new suppliers, refined key elements, such as the air conditioning systems, and begun crash testing the prototype will be on the test track early this summer.
I think they were offering it as an optional extra, not part of the base leasing cost.
http://www.vivarail.co.uk/project-update-14-april-2015-from-the-midlands-to-the-netherlands/
Noticed this tonight. Looks promising, even if the post contains quite a bit of marketing speak
I particularly like this piece. A real poke in the eye for those bleating about "London's cast offs" - and from someone who should know what they're talking about.
THC
I particularly like this piece. A real poke in the eye for those bleating about "London's cast offs" - and from someone who should know what they're talking about.
THC
In the very first part of the preamble, it states that Vivarail plan to replace the Pacers with London Underground D78 stock.
I was unaware that Vivarail had any ownership of the any of the Pacer fleet to enable them to make such a statement. I feel that neither Angel Trains nor Porterbrook know of such a stated Vivarail ownership of their products.
Yet you end your posting with the words...."and from someone who should know what they're talking about".
The TOCs with Pacers don't have to lease Pacer replacements off either Porterbrook or Angel. TPE replaced 158s leased from Angel Trains with 185s leased from Eversholt.
Because it demonstrates clearly the point that, bogies and bodyshell apart, the D-train will be a completely new animal rather than a "cast-off" or even "a bit nicer inside than normal refurb jobs".
While a different issue, its viability in service, as you rightly point out, remains to be seen.
THC
I read it asT...the Northern ITT states the Pacers must be withdrawn and replacements can be one of class 15x trains, class 17x trains or new build and D-Trains are ruled out, unless Northern bidders propose taking them on as additional carriages alongside the replacement carriages.
I read it as
- no non-bogied stock (so, no Pacers); any such stock to be replaced by new trains and those classes you list
- A number (120 was it?) of brand new trains.
I don't see how these two statements can be conjoined as to preclude D-Trains in the fleet. And it's a reasonable assumption that Northern will require more going forward.
DfT said:The Department requires a Franchisee who will procure and bring into service, no
later than 1 January 2020, a minimum of 120 new carriages that are capable of
being used to operate Passenger Services on non-electrified routes. They must
be designed with future demand and users needs in mind, with a clear focus on
passenger comfort and with a thoroughly modern passenger environment and
exterior look. These must be newly-built (not re-using components from existing
rolling stock) and, unless the Bidder intends for them to be hauled by a locomotive,
must be capable of operating under their own power for significant distances on
non-electrified routes.
In the very first part of the preamble, it states that Vivarail plan to replace the Pacers with London Underground D78 stock.
I was unaware that Vivarail had any ownership of the any of the Pacer fleet to enable them to make such a statement. I feel that neither Angel Trains nor Porterbrook know of such a stated Vivarail ownership of their products.
Yet you end your posting with the words...."and from someone who should know what they're talking about".
The actual wording is the below, so it excludes D-Trains.
You know as well as I do that the opening comment is shorthand. If the blog author was to explain the convolutions of thought of, inter alia, the erstwhile MP for Devizes and the Northern Rail ITT then the blogpost would have run to several pages.
To your reply, which is a classic case of not seeing the wood for the trees. If you seriously think that, if GB trials are successful, the D-Train will not in some way be used as a replacement for Pacers, then I have a bridge I can sell you.
THC
I had pondered awhile in the formulation of a response to such a posting as yours but such is my command of the English Language, I may well mentally understand the reasons why such "shorthand" (to use your own description) is used by those charged with such releases for consumption by the public at large, but there is no way that I would let such a statement pass without comment upon the fallacious intimations of ownership so inferred therein.
Your comment suggesting myopian arborational connectivity is one that you make at your peril, suggesting as you do that I have no cognitive ability to differentiate between such matters. I refute such a supercilious puerile statement.
If you read the posting # 1399 on the thread made today by jcollins, you will find that his posting explains the matter of the D-train exclusion, as it appears that you labour under a misapprehension.
With regard to the sale of a bridge you make in your posting, you obviously are unaware of the seven-figure price property that I own in the rural parts of an exceedingly exclusive part of Cheshire East with much land contained, but I do so assure you that the stone-built bridge which was constructed by us in 2007 over the brook on the eastern elevation of the paddock is in excellent condition, so I seek no such replacement.
IT is the definition of the 120 new carriages. Agreed.The actual wording is the below, so it excludes D-Trains.
So, we should really just wait for the demonstrator before we pass judgement and whether or not they will replace the pacer fleet on Northerns routes?
IT is the definition of the 120 new trains. Agreed.
That still doesn't preclude Northern from procuring D-Trains alongside.
IT is the definition of the 120 new trains. Agreed.
That still doesn't preclude Northern from procuring D-Trains alongside.
The actual wording is the below, so it excludes D-Trains.
Edited thx.It's "a minimum of 120 new carriages" (not trains, unless they are all going to be 153-equivalents which is very unlikely).