This presentation from last year helps explain the construction sequence (not mine)
http://www.ice.org.uk/ICE_Web_Porta...Thameslink-KO2-London-Bridge-Presentation.pdf
Is there a bit of platform missing at the end of P10? I thought all platforms were at their final length but there look to be foundations at the country end.
It think they considered it as a option but the facilities were relatively popular and there have been passenger complaints over closure.Going back to the P1/2 platform buildings which at present are not exactly helping the overcrowding. Does anyone know why they were not demolished over Christmas/New Year as I doubt it would have taken long. Were there issues with ending the leases of the concessions located there? Just curious as in a major project like this where every stage is meticulously planned keeping these unnecessary buildings does seem odd.
Going back to the P1/2 platform buildings which at present are not exactly helping the overcrowding. Does anyone know why they were not demolished over Christmas/New Year as I doubt it would have taken long. Were there issues with ending the leases of the concessions located there? Just curious as in a major project like this where every stage is meticulously planned keeping these unnecessary buildings does seem odd.
Thanks, I wonder why they don't get on and finish the job properly, that wall looks pretty cobbled together too. I'm looking forward to the hoarding coming down so we don't need to queue to leave the platform anymore.Yes - the old P9 (12car) was in the way so they could only do very limited work on the last 2 cars worth of platform before Christmas.
Currently has 10 cars usable length, will be 12 when finished. (still an improvement over the old P8 which was only 8 car which it effectively replaced giving a bit more flexibility in platforming or allowing certain services to be 10 car instead of 8 in the interim.)
The end of the P10 is relatively narrow and the retaining wall (between P10 and the track for the new high level P9 the other side of the wall) still needs some work so it will probably be in use when some of the hoarding gets removed and the canopy is more complete.
Thanks, I wonder why they don't get on and finish the job properly, that wall looks pretty cobbled together too. I'm looking forward to the hoarding coming down so we don't need to queue to leave the platform anymore.
Thanks, I wonder why they don't get on and finish the job properly, that wall looks pretty cobbled together too. I'm looking forward to the hoarding coming down so we don't need to queue to leave the platform anymore.
Any idea what happened to the rain canopy on Platform 10? It looks like Godzilla knelt down and took a big bite out of it
At the country end? New construction - some went in Weds night and more last night. It is working towards the current end of the canopy and the gap will be closed soon.
Southeastern badly affected this morning, anyone know what is going on?
Unrelated to what? Engineering works for the tl programme? Sorry just not clear for me.
If that is the case that must be strange to have some many
Notes: There was a short overrun this morning, which was completed at 4.52am.
There were 7 separate failures, the first of which was fixed by 5.05am, however our response teams had 7 of them to fix and therefore it took longer to complete all the work. The causes were a mixture of cable damage, component and asset failures.
The plants are probably a psychological way of calming people in stressful situation that London Bridge is.