Liverpool Lime Street Station will be completely overhalled in 2016/17 according to Network Rail and Northen Rail staff at the station. The announcement will be made after the election!
The station will be completely shut down for 8 weeks in the summer to allow all new signalling to be installed from edge hill down into lime street itself.
What will also happen:
*Platform 6 will be straightened
*Platform 6A (siding) will be brought back into use by moving platform out from main structure pillars. This will become new Platform 7 (HST)
*Old Platform 7 will be moved to the right to accomodate the new platform 7 and be renumbered Platform 8
*The Virgin Trains Ticket Office, Retail Units, Old Post Office glass unit and Virgin Trains waiting rooms will be demolished and relocated into the car park located near to the Skelhorne St entrance. (There will be no car park after work is completed. In place will be two new HST platforms numbered Platform 9 & 10
* Old Platforms 8 & 9 will be renumbered as 11 & 12
* The main concourse where most of the retail area is (WH Smiths & Boots etc) will have a 1st floor concourse added with esculators so more retail and cafe restaurant estabishments can open.
* Costa Coffee will be demolished and a row of new ticket barriers will be installed.
All this work is being done as part of the Northern Hub/Powerhouse. By doing this the capacity at Lime Street will dramaticly increase more trains in and out every hour.
Between 2015-2020 at least 6 new direct rail services will start.
*Liverpool - Glasgow & Edinburgh via Newton-Le-Willow Spur
(Semi Fast - TPE Winners), (Fast - WCML Winners)
*Liverpool - Cardiff via Shrewsbury (Halton Curve reopening)
Arriva Trains Wales
*Liverpool - Holyhead via Chester (Halton Curve reopening) -
Arriva Trains Wales, WCML Franchise Winners
*Liverpool - Hull via Halifax/Bradford Line - Northern Franchise Winners
*Liverpool - London Euston (2nd) - Semi Fast/Fast WCML Franchise winners
The station will be completely shut down for 8 weeks in the summer to allow all new signalling to be installed from edge hill down into lime street itself.
What will also happen:
*Platform 6 will be straightened
*Platform 6A (siding) will be brought back into use by moving platform out from main structure pillars. This will become new Platform 7 (HST)
*Old Platform 7 will be moved to the right to accomodate the new platform 7 and be renumbered Platform 8
*The Virgin Trains Ticket Office, Retail Units, Old Post Office glass unit and Virgin Trains waiting rooms will be demolished and relocated into the car park located near to the Skelhorne St entrance. (There will be no car park after work is completed. In place will be two new HST platforms numbered Platform 9 & 10
* Old Platforms 8 & 9 will be renumbered as 11 & 12
* The main concourse where most of the retail area is (WH Smiths & Boots etc) will have a 1st floor concourse added with esculators so more retail and cafe restaurant estabishments can open.
* Costa Coffee will be demolished and a row of new ticket barriers will be installed.
All this work is being done as part of the Northern Hub/Powerhouse. By doing this the capacity at Lime Street will dramaticly increase more trains in and out every hour.
Between 2015-2020 at least 6 new direct rail services will start.
*Liverpool - Glasgow & Edinburgh via Newton-Le-Willow Spur
(Semi Fast - TPE Winners), (Fast - WCML Winners)
*Liverpool - Cardiff via Shrewsbury (Halton Curve reopening)
Arriva Trains Wales
*Liverpool - Holyhead via Chester (Halton Curve reopening) -
Arriva Trains Wales, WCML Franchise Winners
*Liverpool - Hull via Halifax/Bradford Line - Northern Franchise Winners
*Liverpool - London Euston (2nd) - Semi Fast/Fast WCML Franchise winners