The Sheffield tram-trains will be capable of doing so.Do trams run on 25kv?
The Sheffield tram-trains will be capable of doing so.Do trams run on 25kv?
The Sheffield tram-trains will be capable of doing so.
There is a precedent for a two-car 25kV EMU, the class 309/1 which was introduced in 1962 and ran until the late '70s when they were converted to 3 then 4-car units.
Such a unit nowadays would have very limited application and would be expensive to provide and operate. Far better to use one of the few remaining DMUs to take passengers to the vastly improved services at Maindenhead.
Don't think that they could build one that wouldn't fall foul of the emissions regs
It would be, using a simplistic analysis over a sufficiently short interval.
If you do a proper analysis over the sixty year life of the electrification equipment, the costs pile up rather alarmingly - unless you make idiotically generous estimations of future battery technology.
Trouble is that a new build of DMU with short enough coaches for the platform is probably not going to be viable or even possible, with the current and future emissions regs
Trouble is that a new build of DMU with short enough coaches for the platform is probably not going to be viable or even possible, with the current and future emissions regs
The Marlow branch sounds like the perfect place for Pacers no long required by Northern.
Why was a two car emu thought to be required, out of interest? Obviously it didn't prove to be practical for long.
The Marlow branch sounds like the perfect place for Pacers no long required by Northern.
Given no other sensible solution seems to exist, a cheaper option would be to close the branch and replace the services with buses (just not Solos).
Well, the sensible shorter term option is to retain 2 car turbos on the branch whilst Reading depot has to retain a diesel allocation for other purposes (North Downs and Bedwyn). In the longer term investigate 3x20m car EMU options as I described up-thread.
With the through services to Paddington withdrawn and a half hourly shuttle between Marlow and Maidenhead throughout the day as facilitated by the funding mentioned earlier, all trains between Bourne End and Maidenhead will also be two coaches. Will that be enough capacity or is the extra capacity provided by the longer through trains to Paddington required on the branch itself during the peaks?
Diagram of Bourne End Station with the additional track for enhanced service to Marlow.
I think the electrification as far as Bourne End would enable the through London trains to be run by a single 4x20m car EMU.
With no reversing at Bourne End, a more frequent peak service could run on each leg of the journey and all passengers would benefit from a much more frequent service to London.
Surely the answer is to close Station Road and extend the Marlow platform towards Wycombe. There is an alternative route for traffic that shouldn't cause too much of an issue...![]()
What your diagram doesn't show is that platform 2 is currently longer than platform 1. The existing platform 1 goes as far as the current Marlow crossover and platform 2 stretches towards the crossover where the line singles on the way to Maidenhead.
Here's a picture of the junction from the "Turbo" era.
http://www.mmpa.org.uk/gallery/gallery1/p09.jpeg
Diagram of Bourne End Station with the additional track for enhanced service to Marlow.
http://www.townend.me/files/bourne-end2.pdf
The overhang of vehicles, on the outside of a curve in this case, is known as 'end throw', and together with it's counterpart 'centre throw' on the inside of a curve are the reasons why new platforms are not generally allowed either side of curves less than 300m or so in radius. Of course, there are existing places, notably on the tube, where platforms are on severe curves with significant gaps 'to mind', but these would never be permitted in new construction.
Sending a 4-car EMU into Paddington would be a waste of valuable paths. Unless Maidenhead is being remodelled to allow mainline access to the northernmost platform, any plan to attach the Bourne End EMU to another would block the up slows. Having one stand in platform 5 waiting would be a waste of an EMU.
So if the GWML is to be as busy as some here say the only solution would be to run an EMU shuttle from Maidenhead to Bourne End and a DMU shuttle from Bourne End to Marlow. With no reversing at Bourne End, a more frequent peak service could run on each leg of the journey and all passengers would benefit from a much more frequent service to London. It would even be possible to install a Penrhyn loop at Cookham to allow 2 train working, giving a longer turn-round at Bourne End to give Marlow passengers somewhere warm to sit.
Anything more complicated wouldn't be justified with such a small passenger flow.
That's almost exactly what I tried to suggest in post #32 but I couldn't get the attachment working properly.... The only difference is I didn't put in a scissors crossing but instead slightly shifted both branches on the approach in order to simply move the points slightly further out..
Yes I saw that Peter - the attachment was there in the post to download and view in a word processor, but the forum is unable to directly view .doc files.
I've attached my screen grab of your file, which was the inspiration to try something of my own, thank you! I also first started working on the basis of moving the junction further out, but came to the conclusion that the already tight curve from the Marlow line would be made even worse, and on further investigation I found there was in fact sufficient room for a 3x20m car train in platform 1 so the curves could be left broadly as they are.