A link to the photos I posted over on SSC![]()
Yes, nice pics.
The masts beyond the eastern bridge are baffling.
They are beyond what I took to be the final auto-tensioners.
We'll soon see.
--- old post above --- --- new post below ---
On a quick visit to Victoria today, all the wiring from Deal St through Victoria seems to be up.
It's now difficult to get a clear view from the footbridge, but the Down Chat Moss (has had a missing length for a while) is certainly now wired into the station.
Inside the station, catenary and contact wires run right through on all four platform lines to the tensioners at the Cheetham Hill Road bridge.
However, most of it is in an unfinished form, often suspended by pulleys.
The two wires run together under the Arena floor, separating out towards the extremities of the station.
Some fixing points are still devoid of wires, so quite a lot of configuring is still needed.
It's still unclear what the four masts east of the road bridge are for.
Inside the new station, the roof now looks complete.
However, they are still working on the interface between it and the old station/Arena structure, leaving rain cascading on to the platform below.
The new barrier line was operational with the manual ticket check withdrawn.
It may be just me, but the new roof seems to be a couple of ribs too short.
The eastern ends of the platforms will still get wet.
Metrolink have had to put up a dinky little section of canopy to cover the end of their platforms, outside the overall roof.
It looks completely out of place.