swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,321
The Scotrail franchise agreement here:
http://www.transportscotland.gov.uk...Redacted Franchise Agreement - CU version.pdf
(This is also being discussed in another thread with an emphasis on DMU reductions.)
It suggests in table 1 (page 21) that the 7 x 321s will be 3 car, and this is supported by the capacity figures shown in table 2 (page 23) that gives identical numbers to the existing 320s.
Is there any other information to support the units being shortened after transfer, or is this a mistake in the document?
http://www.transportscotland.gov.uk...Redacted Franchise Agreement - CU version.pdf
(This is also being discussed in another thread with an emphasis on DMU reductions.)
It suggests in table 1 (page 21) that the 7 x 321s will be 3 car, and this is supported by the capacity figures shown in table 2 (page 23) that gives identical numbers to the existing 320s.
Is there any other information to support the units being shortened after transfer, or is this a mistake in the document?
