Plenty of evidence earlier today of tracklaying on the Ebbw Vale extension. It's not continuous yet as there seem to be more than one location where drainage is being excavated. One of these is just north of Ebbw Vale Parkway, where the buffer stop has been moved nearer the station for the present.
The Ebbw Vale Town station site is also being worked on and there appeared to be excavation for the track and platform as well as what appeared to be foundations for platform walls.
The good thing about this project is that so much of it is visible from public roads, paths and footbridge.
The Mechanical Lift appears to be almost complete.
View attachment 21311
View attachment 21312
View attachment 21313
Is there a reasonably large-scale map anywhere showing the exact location of the proposed station?
The map here gives some idea of the location of the two Ebbw Vale stations in relation to the town centre and the rest of the development. Parkway is 9 on the map and Town is 8.
Is there any provision for stabling a unit overnight, as is done at one or two heads of the valley stations?
I'm guessing this is no, then![]()
I was interested as a thread made me look up Rhymney on YT and was surprised to learn that units stable there overnight. I think up to 3, when i checked RTT.
At present the last train up Ebbw Vale, returns empty I believe, rather than stopping,
And the first has to run up the valley, before starting downwards.
Trade off between stabling, security and running staff up to EV, or the fuel to run back and forth to Canton Sidings?
I'm guessing this is no, then![]()
I was interested as a thread made me look up Rhymney on YT and was surprised to learn that units stable there overnight. I think up to 3, when i checked RTT.
Was a train junkie back in the day and thought I knew everything in the South wales region, but You Tube, RTT & Google maps ensure nothing is hidden anymore.
At present the last train up Ebbw Vale, returns empty I believe, rather than stopping,
And the first has to run up the valley, before starting downwards.
Trade off between stabling, security and running staff up to EV, or the fuel to run back and forth to Canton Sidings?
cdxtn
And have the unit broken into and trashed every night.......
NX
Both Rhymney and Treherbert have units stabled overnight, and in addition, both have traincrew depots (although not large by my understading).
Regarding stabling at Ebbw Vale - aside from security concerns with keeping a unit there overnight, Rhymney depot is only 6 miles from Ebbw Vale, so it would make sense to prevent dead-heading if two sets of crew were taxied there from Rhymney before and after the last serices. ....
I wondered whether that would be the fate of this lift funicular thing.
Hope not! I would expect it to be welll designed to resist most likely damage and allow graffitti to be removed easily much like modern lifts in car parks etc, and there should be CCTV monitoring and recording so there's at least a hope of identifying perps doing anything antisocial in there. It'd be nice to see one of these at Tavistock one day if the through route and high level town centre station is ever revived!

, 
Tracklaying continues and here are some photographs taken in the last week or so.
Looking north, the railway closely follows the road line (also of relatively new construction). I would guess that this is close to the former Tyllwyn Halt.
View attachment 21462
Looking south towards the road bridge close to Ebbw Vale Parkway, the ballasting now looks as if it is complete as far as Ebbw Vale Parkway station, although the track is incomplete, but has advanced in the last week. This location, I believe, was the former Dyffryn Sidings, latterly used by EWS until closure of the steel works and the branch in its former use :
View attachment 21461,
Looking north, the buffer stop is currently fixed at the end of the platform at Ebbw Vale Parkway, and just short of milepost (18m 40ch). The line goes through a bridge just below the road direction sign.
View attachment 21463
Interesting pictures, thanks RP. I wonder why the positioning of the track seems to follow the original layout of the sidings than a more streamlined approach running almost through the centre of the picture / former sidings.
Just a quick question, can anyone pin point me as to where the new Town Station will be built, and the current progress in redoubling up from Crosskeys?






Thanks for the pics RP.
The NR spring newsletter says that the capacity works are due to be completed by 2018, is this is mistake? Thought it was 2016.
Also is Ebbw Vale Town getting a second platform? This was in the original capacity enhancement plans I think.
An interesting question - assuming Valley Lines electrification goes ahead - will Ebbw Vale Town and Rhymney be the highest points above sea level for an electrified branch/commuter line in the UK? They wouldn't beat the WCML as a main line, but I believe that both exceed 900 feet above sea level.