In light of pablo's subsequent post, I now really have no idea what he was getting at in post #86; anyone else wondering?
Presumably this is on the assumption that the Tring locals go onto Crossrail so platforms 17 and 18 are no longer needed for classic services, as the HS services appear to be going there?
No, the whole lot still uses Euston.
Will there not be some scope to reduce the Intercity services travelling to Euston on lignes classiques once HS1 opens, though? Will Birmingham and Manchester both really need 3 fast services per hour operated by the WCML operator, for example?That's going to work. In a "not going to work" sense...
A rebuild at the soon to be half empty King's Cross would make more sense than using Waterloo in combination with Euston - would also keep all the High Speed services in fairly close proximity.
But then I prefer to get HS2 into only Euston and keep KGX available for the next High Speed line.
Will there not be some scope to reduce the Intercity services travelling to Euston on lignes classiques once HS1 opens, though? Will Birmingham and Manchester both really need 3 fast services per hour operated by the WCML operator, for example?
An issue I raised earlier but didn't seem to get much attention.
Why are they being so generous with the length of time that a high speed train spends on one platform?
What figure are they proposing?
Neil
What figure are they proposing?
Proposing that a platform can only serve two trains per hour. I think it's a case of a 400m double-decker having 1000 seats in total and only one door per carriage, so the loading/unloading time for a train arriving full in Euston and leaving full will be pretty substantial. There will presumably be some cleaning (at the least, emptying bins and retention tanks, refilling water tanks, restocking the buffet/shop and collecting lost property), at least part of which will have to be done while there are no passsengers on board.
There may be a case for getting a few captive platforms (as few as 4) open quickly and then doing the rest of the works more slowly. There won't be more than nine captive trains per hour for a very long time, and the first generation are going to be single-deckers, with quicker loading and unloading times. The need to future-proof the station with eleven platforms is real - they'll end up rebuilding it eventually, so better to plan it properly from the beginning - but they don't need all eleven on day one.
You're missing the point. Six platforms will take the whole initial service. SW can have Waterloo all to themselves.
So are you suggesting running HS2 services to Waterloo or not?
If you fancy them there, why not? But with the current proposal, it's not necessary. Please do keep up.
Is there not a bigger picture to this latest Euston story?
The bigger picture is that HS2 cannot be built within the £50.1 billion 'envelope', cannot be built without crowding out other rail investment, and is unlikely to open in 2026.
I'm not sure if I've actually read a figure for the length of time it takes to turn around a train. But if you take the figure of 18tph as the reference and you're given between 6 and 10 platforms (depending on the proposal) that gives you between 20 and 33 minutes per train.
It takes a couple of minutes to run a train through the throat and onto a platform. And about the same in reverse. And if you're taking longer than 10 minutes to fully load and unload a train you're simply not trying. It could be done in 5 (though that would require a well designed station).
Keep the time down to 10-15 minutes and you need 3-5 platforms.
The bigger picture is that HS2 cannot be built within the £50.1 billion 'envelope', cannot be built without crowding out other rail investment, and is unlikely to open in 2026.
Of course the platforms for these don't have to be Captive standard but will need to be 400m. Given the Sleeper also needs 400m platforms in the legacy area of the station it makes sense to have 2 400m platforms that can be accessed from both HS2 and WCML.
.
Proposing that a platform can only serve two trains per hour. I think it's a case of a 400m double-decker having 1000 seats in total and only one door per carriage, so the loading/unloading time for a train arriving full in Euston and leaving full will be pretty substantial.
They will be seperate entities, there wont be access between the two.
The bigger picture is that HS2 cannot be built within the £50.1 billion 'envelope', cannot be built without crowding out other rail investment, and is unlikely to open in 2026.
It now looks likely to also lose Hertford Loop to Moorgate - as we keep hearing more and more about keeping that station open 24/7 - indeed there is no major technical reason you couldn't do that.Why will Kings Cross be empty? It's only losing a few GN trains to Thameslink.
The tunnel has little reason to exist - not in the age of powered excavation equipment. You can skylight it and have the canal (which has to remain open unfortunately) cross the approach on an aqueduct.And I'd be interested to see how it could be reconfigured to handle 400m trains, given that it's about that distance from the stops to the tunnel portals.
It now looks likely to also lose Hertford Loop to Moorgate - as we keep hearing more and more about keeping that station open 24/7 - indeed there is no major technical reason you couldn't do that.
That leaves KGX with some peak extras, Intercity trains and the Beer Train - hardly enough to justify the cavernous station.
So we expend insane amounts of money building this new line capable of taking double decker trains - then throw away 40% of the capacity it makes available because we don't want to pay for proper provision of platforms.You make two significant assumptions here.
One - that they'll definitely be double deck trains - the gauge being designed for it doesn't mean they have to use DD trains.
Two - single door per carriage. Presumably you think this because the original Eurostar sets have only one door (per side) per carriage? But the latest Eurostar sets have doors at both ends, so why wouldn't HS2 captive stock?
But just like Euston, Virgin East Coast may seek to increase services (indeed I believe they do plan that) and thus make it busier with IC services. Euston used to be quiet - it's now nothing of the sort with 3 rather than 1tph to Manchester and Brum.
Neil
Because the only double deck train actually available today only has 1 door per carriage?
So we expend insane amounts of money building this new line capable of taking double decker trains - then throw away 40% of the capacity it makes available because we don't want to pay for proper provision of platforms.
Can you imagine the political cost? One of the big benefits in the public eye of HS2 is mass capacity, symbolised by double deck trains.