• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Creation of class 230 DEMUs from ex-LU D78s by Vivarail

Status
Not open for further replies.

D60

Member
Joined
16 Feb 2015
Messages
287
How about 'bi-mode' 313s for Liverpool to Preston via Ormskirk? Has this been suggested on here before?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,425
Location
A typical commuter-belt part of north-west England
No it wasn't wrong as that is what has been said by Vivarail I do believe. Now tell me why you deem them and the whole conversion as 3rd rate

There are too many imponderables, such as the proposed diesel engines, to my way of thinking and unlike some on this thread, I am far too old and wise to swallow PR information from Vivarail and its Private Equity Backers "hook, line and sinker", having spent over thirty-five years at the level of Senior Management, prior to my retirement as Senior Head of Projects at the consultancy. Any fool with an aptitude for creative "pretty pictures" can produce a most attractive marketing publication.

It has been quite rightly said that it is far too early to make full assumptions as to the conversion worthiness and with this, I totally agree. What did annoy me was the cost comparison suggested which some on this thread have seized upon as financial correctness and all its implied implications which is exactly what Vivarail and its backers wished the general public wanted to believe.

I would ask you to read posting # 956 on this thread by Greybeard33 that concerns diesel engine usage in its normal automotive life and a comparison of the operational requirements of same in a railway scenario.
 
Last edited:

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,466
Location
Llandudno
Presumably a maintenance regime tailored specifically to these specific engines will need to be devised, possibly involving rebuild or replacement at intervals... Information from Vivarail suggests they can be dropped out of a unit and replaced with a new or reconditioned example as a straightforward, simple and routine task... (But I believe all of this has been covered on here before..)

Sounds like a good idea - we've been here before of course with marine Deltic engines been deemed unsuitable.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
60mph trains replacing 75mph trains isn’t a problem as long as the 60mph trains can cope with the services that they are scheduled to run on (just like it wasn’t a problem when 75mph trains replaced 125mph trains on Northern’s service from Preston to Hazel Grove!).

In the case of the Northern 180 diagrams they were actually timed as being operated by 150s, given the 180s were intended as a short term measure until cascaded 150s were made available and Sprinters were required to fill in on occasions when Northern had the 180s.

I think we need to see what the ITT says with regards to rolling stock when it gets released. I doubt it'll be as specific as the Scotrail ITT but it should give some clues as to what the options will be.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,568
Location
Torbay
I would ask you to read posting # 956 on this thread by Greybeard33 that concerns diesel engine usage in its normal automotive life and a comparison of the operational requirements of same in a railway scenario.

Duty cycle for a modern delivery van type engine in urban traffic is perhaps fairly similar to railway applications for local services, with repeated high power accelerations from frequent stops.

I agree cost is going to be the main issue. All the development expenditure has to be recouped from leasing or selling this limited fleet. The power pack concept might have a larger market if successful, even for entirely new trains, but there's a risk no one will want any diesels at all in an increasingly electrified future.
 

notadriver

Established Member
Joined
1 Oct 2010
Messages
3,737
But Diesel engines in road vehicles rarely spend extended time at maximum rpms the way they do in diesel rail vehicles ?
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Didn't they say they would be operating similar to 185's eco mode and being computer managed and not all working 100% of the time? Could also be using a battery to buffer the power and even out some of the demands.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,408
The 150s were built as solid units but they've got to the age when either they need life extension work to continue in service or they need to be withdrawn. Northern unit 150135 spent 18 months out-of-service due to corrosion issues, which cast doubts over how long some of the 150s can remain service without major work.

A serious question - is this a feature of Northern's peculiar brand of "maintainance" or a more widespread issue?
 

notadriver

Established Member
Joined
1 Oct 2010
Messages
3,737
Didn't they say they would be operating similar to 185's eco mode and being computer managed and not all working 100% of the time? Could also be using a battery to buffer the power and even out some of the demands.


185s are overpowered for the work / timings they are on. What's the installed power on the d78s?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,658
Location
Nottingham
But Diesel engines in road vehicles rarely spend extended time at maximum rpms the way they do in diesel rail vehicles ?

It takes a lot less power to keep a train moving than it does for a road vehicle of the same weight, so traditionally with rail diesel engines the problem has been frequent transitions between max power for acceleration and little or no power at other times. But this seems to have been a problem mainly for HSTs. The smaller engines on Sprinters etc seem to have been pretty reliable and these are similar to larger automotive engines.

Also the mechanical transmission on a road vehicle or the hydraulic transmission with lock-up on most DMUs means the engine has to be near maximum revs at maximum speed, because it is directly geared to the wheels. D78 will have electric transmission which means the engine can operate at the optimum speed to produce the power required at any particular time.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,408
Heavy maintenance is the responsibility of the ROSCO not the operator.

That I know but the actions of the TOC often don't help.. I'm pretty sure that I've seen mention of corrosion being exacerbated by badly applied vinyls for example...
 

Brian Aylott

Member
Joined
11 Oct 2012
Messages
262
That I know but the actions of the TOC often don't help.. I'm pretty sure that I've seen mention of corrosion being exacerbated by badly applied vinyls for example...
Vinyls are applied by specialists - nothing to do with the operators
Anyway most corrosion problems are in units with no vinyls
Brian
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,056
Location
Reston City Centre
More seats in third-rate refreshed elderly rail units

Well, bowing to your obvious superior knowledge of rolling stock provision, would you describe these units, with all that is stated needed to be done to them, as "first-rate" or "second-rate" units ?

I’m not jumping to conclusions about what standard the refresh will look like in reality (I’m ignoring the “artists impressions” on the website) – I was just surprised that you were.

I guess you've never been to Scotland

Born there, lived half my life there, thanks...

As to the 73s, Aslef have expressed fears about their use in "The Scotsman".

http://www.railforums.co.uk/showthread.php?t=105739

...but other than predictable Union sabre rattling, the terms and conditions of the Scottish franchises (ScotRail and Sleeper) haven’t seen anything like the complaints that you typically see from north (west) England about things.

That’s the point that I was making – people in Dundee aren’t wailing about getting 1970s “London rejects” to replace their post-privatisation DMUs but people in Manchester are wailing about getting 1980s “London rejects” to replace their 1980s DMUs (319s replacing 150/156s). Those north of the border are less hysterical about such things.

I can reassure you that the information provided by D60 above and before is correct. As to help, I have an assortment of links to "back up" what D60 says- as D60 says, Feb's Railway Magazine states that they are Ford diesel units, Modern Railway's Roger Ford says so in the December 2014 one, available online here, Rail Technology Magazine goes further to call them "Transit engines", and finally the "Land Rover Owner International" magazine/online thing calls them Ford Duratorq engines as used in the Land Rover Defender cars. According to RAIL, a company called "Revolve" (of Essex) is supplying the engine power modules [ref]. Rail Technology Magazine's Sam McCaffrey also partook in an interview with Vivarail where they described the new diesel engines as "two 3L Ford Diesel engines combining to create 400hp for each driving car, plus a modern alternator and inverter with an output of 750v DC, plus a compressor".

The "key figure" is also Adrian Shooter, the ex-boss of the rather successful Chiltern [ref here], so I suspect that he knows what he's doing :) .

jcc

Very interesting post, thanks :)

It has been quite rightly said that it is far too early to make full assumptions as to the conversion worthiness and with this, I totally agree

I agree, it’s far too early to reach conclusions about these units, which I was surprised to see a learned member of the Forum describe them as “third rate” refreshes when we don’t know how they’ll look.

I see, so you are happy for someone to claim that a conversion of 30 year old stock, with a low maximum speed and completely untested apart from computer simulations on a slow line (which apparently yielded a whopping 3 minute journey reduction), with a price tag somewhere between 1/3 to 2/3 of the cost of a new unit is going to be the best on the network? This doen't ring any alarm bells? You don't happen to work for DfT by any chance?

I’m not losing any sleep over what a PR mouthpiece claims – what matters is whether this stock is suitable for whatever services are found for it (if any) – be that in Thurso or Penzance.

Since there are plenty of “slow” lines in the UK, which tend to require subsidising, I don’t think it’s a bad idea to investigate whether we can convert stock to run on these services (which would free up the 75mph stock on those lines to lines that do require faster speeds).

Of course it’s “untested” (other than in computer programming terms), because they aren’t ready yet. Similarly, 345s, 700s, 800s and 801s are “untested” on British tracks.

It's one thing to take the D stock convertions and pitch them as a cheap and cheerful solution for branch lines if Roscos/Tocs want to take a chance. But pitch them as the best on the network and try to make them sound like they are suitable for longer journies (the Country veversion with the 2x2 around tables configuration) and you are at best stretching the truth. Remind me never to buy a second hand car from them, or you for that matter.

Of course the PR people are going to promote them as being the best, that’s what they do – I’m surprised that you are surprised by this! They’re hardly going to say that TOCs would be better hiring more Sprinters, are they?

As for the idea of D78s with “universal” toilets, 2+2 seating, tables... there are some longer distance lines (Heart of Wales, Far North, Kyle, Cumbrian Coast...) where many passengers are travelling long distances but there’s no need for running at over 60mph.

Would properly refurbished D78s be the end of the world on such routes?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,379
Location
"Marston Vale mafia"
Would properly refurbished D78s be the end of the world on such routes?

I don't think they would. Nice big windows, for one. Could even be sold as scenic stock.

Yes, they look a bit odd with some doors plated over, but equally so do Class 185s, I'm not convinced there are two windows the same size on the whole unit.

Neil
 

D60

Member
Joined
16 Feb 2015
Messages
287
800hp per 3-car aluminium-bodied D-train delivered electrically... vs 300hp per 2-car steel-bodied 1st generation diesel railcar, or 600hp for a 3-car set, delivered via less efficient, more stressy mechanical transmission... Even the SR's demu fleet with above-floor engines only produced (from memory) 600hp for a steel-bodied 3-car set... Don't know whether these figures are directly comparable, but I'm sure someone more knowledgable will advise..!
 

notadriver

Established Member
Joined
1 Oct 2010
Messages
3,737
It takes a lot less power to keep a train moving than it does for a road vehicle of the same weight, so traditionally with rail diesel engines the problem has been frequent transitions between max power for acceleration and little or no power at other times. But this seems to have been a problem mainly for HSTs. The smaller engines on Sprinters etc seem to have been pretty reliable and these are similar to larger automotive engines.



Also the mechanical transmission on a road vehicle or the hydraulic transmission with lock-up on most DMUs means the engine has to be near maximum revs at maximum speed, because it is directly geared to the wheels. D78 will have electric transmission which means the engine can operate at the optimum speed to produce the power required at any particular time.


I thought that on diesel electric units, that it was the same that full engine rpms are used. Class 22x units springs to mind.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,379
Location
"Marston Vale mafia"
They are to some extent, as 1st generation DMUs are also generally 18m vehicles.

Neil
--- old post above --- --- new post below ---
I thought that on diesel electric units, that it was the same that full engine rpms are used. Class 22x units springs to mind.

22x don't use full revs when they don't need full power. They use whatever revs are required to generate the required power, which will be full[1] revs for much of acceleration then lower once cruising.

[1] Optimal power output vs. life rather than red-line I expect.

Neil
 

Camden

Established Member
Joined
30 Dec 2014
Messages
1,949
I’m not jumping to conclusions about what standard the refresh will look like in reality (I’m ignoring the “artists impressions” on the website) – I was just surprised that you were.



Born there, lived half my life there, thanks...



...but other than predictable Union sabre rattling, the terms and conditions of the Scottish franchises (ScotRail and Sleeper) haven’t seen anything like the complaints that you typically see from north (west) England about things.

That’s the point that I was making – people in Dundee aren’t wailing about getting 1970s “London rejects” to replace their post-privatisation DMUs but people in Manchester are wailing about getting 1980s “London rejects” to replace their 1980s DMUs (319s replacing 150/156s). Those north of the border are less hysterical about such things.



Very interesting post, thanks :)



I agree, it’s far too early to reach conclusions about these units, which I was surprised to see a learned member of the Forum describe them as “third rate” refreshes when we don’t know how they’ll look.



I’m not losing any sleep over what a PR mouthpiece claims – what matters is whether this stock is suitable for whatever services are found for it (if any) – be that in Thurso or Penzance.

Since there are plenty of “slow” lines in the UK, which tend to require subsidising, I don’t think it’s a bad idea to investigate whether we can convert stock to run on these services (which would free up the 75mph stock on those lines to lines that do require faster speeds).

Of course it’s “untested” (other than in computer programming terms), because they aren’t ready yet. Similarly, 345s, 700s, 800s and 801s are “untested” on British tracks.



Of course the PR people are going to promote them as being the best, that’s what they do – I’m surprised that you are surprised by this! They’re hardly going to say that TOCs would be better hiring more Sprinters, are they?

As for the idea of D78s with “universal” toilets, 2+2 seating, tables... there are some longer distance lines (Heart of Wales, Far North, Kyle, Cumbrian Coast...) where many passengers are travelling long distances but there’s no need for running at over 60mph.

Would properly refurbished D78s be the end of the world on such routes?
Are people in Manchester really getting irate at the prospect of cascaded trains, or is it just interested parties? I've discussed rolling stock cascades with various people on Merseyside who have seemed uniformly enthusiastic about the upcoming class 319 trains especially with the northern refresh. If I asked them if they were bothered about the trains being hand me downs I generally just got a "heard it all before" roll of the eyeballs (although someone did quip that he thought some elsewhere in the region might believe they are too good now for cascaded trains!)

I have high hopes for the D78s, which were a nice unit to ride, and look forward to the demonstrator!
 
Last edited:

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
It takes a lot less power to keep a train moving than it does for a road vehicle of the same weight, so traditionally with rail diesel engines the problem has been frequent transitions between max power for acceleration and little or no power at other times. But this seems to have been a problem mainly for HSTs. The smaller engines on Sprinters etc seem to have been pretty reliable and these are similar to larger automotive engines.

Also the mechanical transmission on a road vehicle or the hydraulic transmission with lock-up on most DMUs means the engine has to be near maximum revs at maximum speed, because it is directly geared to the wheels. D78 will have electric transmission which means the engine can operate at the optimum speed to produce the power required at any particular time.
But the maximum gross weight of a fully loaded Ford Transit van is about 5T. According to the RTM interview with Adrian Shooter, a 3-car D78 will weigh about 75T (25T per vehicle) plus, say, 25T of passengers, i.e. 100T gross weight, divided between 4 engines. Therefore each engine will have to accelerate about five times more mass in the train than in the van - much higher loading.

A 2/3 car D78 will have twice as many engines as a conventional 2-car DMU. So, unless the engines are twice as reliable, engine failures in service, requiring unscheduled maintenance, will be more frequent. Scheduled maintenance is also likely to be more costly because there will be double the number of engines to work on.

These units may have low leasing costs (although the cost of the conversion will have to be recovered over a relatively short service life), but what matters to the TOC is total operating cost, taking account of maintenance costs and fleet availability.
 

D60

Member
Joined
16 Feb 2015
Messages
287
The diesel railcars I grew up with, for instance on Manchester - Blackpool trains, had 4 x 150hp bus engines with mechanical transmission per 3-car steel-bodied set... Whereas D-trains will be equipped with 4 x 200hp automotive engines with electric transmission per aluminum-bodied 3-car set.. which sounds to me like a third more power, delivered more efficiently..? And no-one is suggesting using them on Manchester - Blackpool or anything comparable, due to their acknowledged speed limitations... As I say, I don't know whether these figures are directly comparable.. and as I and others have already said, the proof will be in the demonstrator, when it emerges..
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
A 2/3 car D78 will have twice as many engines as a conventional 2-car DMU. So, unless the engines are twice as reliable, engine failures in service, requiring unscheduled maintenance, will be more frequent. Scheduled maintenance is also likely to be more costly because there will be double the number of engines to work on.

They've gone for the same solution as IEP, having the engines in a raft that can be dropped out in 10 minutes and replaced with a spare allowing you to work on the engines leisurely.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,319
A transit diesel is likely to be very much cheaper than a railway rated engine (as its a mass produced item if nothing elsE) - so you might be able to tolerate much shorter engine lives and use them as expendables.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,658
Location
Nottingham
But the maximum gross weight of a fully loaded Ford Transit van is about 5T. According to the RTM interview with Adrian Shooter, a 3-car D78 will weigh about 75T (25T per vehicle) plus, say, 25T of passengers, i.e. 100T gross weight, divided between 4 engines. Therefore each engine will have to accelerate about five times more mass in the train than in the van - much higher loading.

A 2/3 car D78 will have twice as many engines as a conventional 2-car DMU. So, unless the engines are twice as reliable, engine failures in service, requiring unscheduled maintenance, will be more frequent. Scheduled maintenance is also likely to be more costly because there will be double the number of engines to work on.

The acceleration of the train (0-60 time) will be much less than that of a Transit. It will be exerting about the same loading but for a longer time and less frequently. Not easy to say which is harder on the engine.

Although it has twice as many engines, the failure of one will leave it with 75% instead of 50% power so the impact will be much less.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
But the maximum gross weight of a fully loaded Ford Transit van is about 5T. According to the RTM interview with Adrian Shooter, a 3-car D78 will weigh about 75T (25T per vehicle) plus, say, 25T of passengers, i.e. 100T gross weight, divided between 4 engines. Therefore each engine will have to accelerate about five times more mass in the train than in the van - much higher loading.

A 2/3 car D78 will have twice as many engines as a conventional 2-car DMU. So, unless the engines are twice as reliable, engine failures in service, requiring unscheduled maintenance, will be more frequent. Scheduled maintenance is also likely to be more costly because there will be double the number of engines to work on.

These units may have low leasing costs (although the cost of the conversion will have to be recovered over a relatively short service life), but what matters to the TOC is total operating cost, taking account of maintenance costs and fleet availability.

What you've missed in your calculation is that in the Transit the engine is driving the gearbox directly - a mechanical transmission.

However in the proposed D78 the engine is there to drive an electric motor which will provide the transmission - so the two are not directly comparable and the stress on the engine quite different.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
What you've missed in your calculation is that in the Transit the engine is driving the gearbox directly - a mechanical transmission.

However in the proposed D78 the engine is there to drive an electric motor which will provide the transmission - so the two are not directly comparable and the stress on the engine quite different.
My point was that engine design is inevitably a compromise between various conflicting requirements. Automotive engines are optimised for automotive requirements, which, as you rightly point out, are quite different to those for a DEMU engine. A D78 engine will spend most of its life alternating between periods of constant speed, maximum power operation and periods at idle/shutdown. Maximum power means maximum mechanical stress and maximum component temperatures. Sudden cutback from maximum power to idle/shutdown causes high thermal stress, particularly on components like turbochargers. Purpose-designed railway diesel engines are optimised for high reliability and long intervals between overhauls with this type of duty cycle.

I might be proved wrong, but I think there is a risk that the automotive engine will turn out to be unreliable in the D78 application, and expensive to maintain.
 

Emblematic

Member
Joined
14 Aug 2013
Messages
659
My point was that engine design is inevitably a compromise between various conflicting requirements. Automotive engines are optimised for automotive requirements, which, as you rightly point out, are quite different to those for a DEMU engine. A D78 engine will spend most of its life alternating between periods of constant speed, maximum power operation and periods at idle/shutdown. Maximum power means maximum mechanical stress and maximum component temperatures. Sudden cutback from maximum power to idle/shutdown causes high thermal stress, particularly on components like turbochargers. Purpose-designed railway diesel engines are optimised for high reliability and long intervals between overhauls with this type of duty cycle.

I might be proved wrong, but I think there is a risk that the automotive engine will turn out to be unreliable in the D78 application, and expensive to maintain.
It's worth noting that the engine appears to be de-rated some 20% from its lowest rating in automotive applications, at least in the Land Rover / Citroen specifications (I cannot find details of the Transit use.) Railway cycling as described above has caused problems in other engines adapted for rail use, but these often have been larger engines adapted from marine or stationary generator applications. Other engines adapted from road use have generally fared well - like rail, road use is constantly varying load, in fact much more so than rail.
Maintenance costs are unlikely to be high, the low cost of the engine itself ensures that any significant repair would just involve replacement. However there are still risks. Design and performance of ancillaries, such as the cooling and generator systems, will be critical.
I don't see any fundamental problem in the approach, but there are plenty of 'known unknowns' in this project so it will be interesting to see how it develops.
 
Last edited:

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
It's worth noting that the engine appears to be de-rated some 20% from its lowest rating in automotive applications, at least in the Land Rover / Citroen specifications (I cannot find details of the Transit use.)
If Wikipedia is to be believed, Vivarail has selected the 3.2L Ford Duratorq TDCi inline-five turbo intercooled engine, with a nominal rating of 200hp, used in the Ford Transit and Ford Ranger.
http://en.wikipedia.org/wiki/Ford_Duratorq_engine
This engine does not appear to be available in the UK Transit, but the Ford spec for the US model quotes only 185hp @ 3000rpm, i.e. 7.5% derated.
http://www.ford.com/trucks/transitvanwagon/specifications/engine/
I guess Vivarail might also choose to derate it, trading acceleration for durability, depending on the results of performance testing on the D78 prototype.
 

Clip

Established Member
Joined
28 Jun 2010
Messages
10,821
My point was that engine design is inevitably a compromise between various conflicting requirements. Automotive engines are optimised for automotive requirements, which, as you rightly point out, are quite different to those for a DEMU engine. A D78 engine will spend most of its life alternating between periods of constant speed, maximum power operation and periods at idle/shutdown. Maximum power means maximum mechanical stress and maximum component temperatures. Sudden cutback from maximum power to idle/shutdown causes high thermal stress, particularly on components like turbochargers. Purpose-designed railway diesel engines are optimised for high reliability and long intervals between overhauls with this type of duty cycle.

I might be proved wrong, but I think there is a risk that the automotive engine will turn out to be unreliable in the D78 application, and expensive to maintain.

And do you not think that Vivarail would've explored all this before settling on the engine they have?

Or do you think they just popped down to Dagenham one day and picked the first one they saw?
 
Status
Not open for further replies.

Top