Refurb is refurbed isn't!
Refurb is listed as a verb, meaning the past participle is also valid
Refurb is refurbed isn't!
4 92s? So are they expecting 100% availability then?
I agree. It would be nuts to expect 100% availability. Reckon GBRf will keep a couple of extras in reserve out of their pool of 16 ..... in glowing BR Railfreight grey!This could be a "contracted to provide" number rather than a fleet / pool total number?
Presumably the fifth 73 will be required for the Edinburgh - Carstairs - Edinburgh portion so only one of those spare.
That is the case at present, however if GBRf are indeed only providing four class 92s each night to work the sleepers, then they are a loco short to work the Edinburgh Carstairs (and return) portion of the sleeper, which requires a fifth loco.Why would Edinburgh - Carstairs need a diesel loco? It's entirely under the wires and I believe it uses a 90 right now (though I may be mistaken).
Does the use of slower 92s mean an end to the possibility of the lowland sleeper arriving anything up to 50 minutes early at Euston? The advertised time is 0707 but it appears to typically arrive around 0630. Indeed, when I caught it last week, it arrived at Euston at 0610.
http://www.realtimetrains.co.uk/train/G97236/2015/02/10/advanced
That occurred to me as well - Cl92 max speed 87mph, Cl90 max speed 110mph, sleeper currently permitted up to 100mph to make up time.
That is the case at present, however if GBRf are indeed only providing four class 92s each night to work the sleepers, then they are a loco short to work the Edinburgh Carstairs (and return) portion of the sleeper, which requires a fifth loco.
That is the case at present, however if GBRf are indeed only providing four class 92s each night to work the sleepers, then they are a loco short to work the Edinburgh Carstairs (and return) portion of the sleeper, which requires a fifth loco.
4 92s? So are they expecting 100% availability then? I hope their contract with ACLG extends to emergency cover for the service when one of the 92s is unavailable.
GB Railfreight have arranged a contract for Electric Traction Limited (ETL) to provide AC Locomotive Group locos to work the sleeper stock moves between Wembley and Euston.ACLG? Who's got a contract with them? Does that mean we could be seeing 86s on the sleeper?
GB Railfreight have arranged a contract for Electric Traction Limited (ETL) to provide AC Locomotive Group locos to work the sleeper stock moves between Wembley and Euston.
Should see 86101 86401 and 87002 acting as ECS locos from Wembley. There's a good chance they could produce as emergency cover or, more likely, on Euston-Wembley moves prior to a ECML divert
92014 92018 92023 92033 are the dedicated sleeper locos (GBSL - Sleeper pool) with 92010 92032 92044 in the reserve pool (GBST - Sleeper/Channel Tunnel)

Jolly smart! Some tasteful vinyls for the branding, should look a treat!As it happens, here's a photo from wnxx's twitter of 86101 in Caley livery... https://twitter.com/wnxxuk/status/568463174682472448
Should make no difference to booked timings though, as the train is timed at max 80 mph for passenger comfort (and presumably to ensure people don't arrive at their destination too early!).
Sleepers are timed 100 MPH south off Crewe otherwise they would get in the way off Pendolino's
Mark
http://www.mark5812.smugmug.com
How will the 92s manage that?!
Should see 86101 86401 and 87002 acting as ECS locos from Wembley. There's a good chance they could produce as emergency cover or, more likely, on Euston-Wembley moves prior to a ECML divert
92014 92018 92023 92033 are the dedicated sleeper locos (GBSL - Sleeper pool) with 92010 92032 92044 in the reserve pool (GBST - Sleeper/Channel Tunnel)
I thought they used the slows and therefore only completed with 350s?
The Lowland sleeper appears to be timed / booked for the slow line south of Hanslope but if the fast line is open will use that and arrive early. In the normal course of events, it doesn't interact with 390s.
The Highland sleeper is more of a problem as it really does interact with 390s being booked to arrive in Euston at 0747. It passes Rugby only ten minutes ahead of a service from Liverpool which is due into Euston at 0750. Its timing is noticeably shorter between Euston and Crewe than the down service.
With all portions of the Highland sleeper combining/splitting at Edinburgh, unnecessary additional mileage and extended journey times for Inverness and Fort William portions are incurred.
It is unfortunate that the Aberdeen and Edinburgh portions cannot run together via the East Coast route to Kings Cross or St Pancras and FW, Inverness and Glasgow portions run together West Coast to Euston or St Pancras. The more direct route down the west side should see arrival in Crewe 20 minute earlier to stay ahead of Pendos south of Crewe. The only downside would be combining two portions at Mossend in rain and snow.
The electrically hauled Glasgow portion would be added at Carstairs as now but to different portions.
The downside here is that the current Glasgow portion would arrive London later and leave London earlier.
Great to see 86401 with regular work again! I know that one in particular had an uncertain future! Are these locomotives going to actually be registered on TOPS again (if they were ever deregistered) for these purposes?
All those locos have remained on TOPS, 86101 and 87002 still see occasional mainline use (86101 is now up at Mossend for ice breaking duties, covering for 87002 which is at Brush for repaint). All those 92s have remained on TOPS albeit stored, and I'm sure 86401 has remained on TOPS.
And where exactly are they going to get long enough platforms at St Pancras let alone the paths and long platform occupancy? The current arrangement is perfectly adequate.
Exactly in the International platforms where Sleeper services from the Continent were going to terminate here.