I have just been looking at the new West Yorkshire Integrated Authority website for information on East Leeds Parkway station and came across a statement dated November 2014 that the Wortley Curve is to be reopened to allow trains from Bradford to travel to Wakefield without entering Leeds station.

Can somebody please tell me how long the curve is from junction to junction?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,353
Location
Yorkshire
Have to say I'm rather surprised there's (presumably) a business case for Wortley curve, Wakefield to Bradford is not a huge market, and as there's no longer the Bowling curve to avoid Bradford Interchange I can't see it having much use for freight. Surely the benefits of serving Leeds outweigh the extra journey time needed.
 

class 9

Member
Joined
18 Nov 2010
Messages
1,078
I have just been looking at the new West Yorkshire Integrated Authority website for information on East Leeds Parkway station and came across a statement dated November 2014 that the Wortley Curve is to be reopened to allow trains from Bradford to travel to Wakefield without entering Leeds station.

Can somebody please tell me how long the curve is from junction to junction?

No more than half a mile.
 

ic250

Member
Joined
3 Apr 2014
Messages
60
Surely some kind of connection between the line to Wakefield Westgate would be better, thus providing an electrified link from the Airedale line branch to Bradford (and on to London) without having to go via Leeds?

Not sure this would be possible though, looking at google maps.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Surely some kind of connection between the line to Wakefield Westgate would be better, thus providing an electrified link from the Airedale line branch to Bradford (and on to London) without having to go via Leeds?

Not sure this would be possible though, looking at google maps.

Surely the Wortley curve does link at its south end to the electrified line to Wakefield Westgate. The problem is that at its west end it links to the non-electrified line to Bradford Interchange, not the electrified line to Bradford Forster Square (and Airedale and Ilkley).

Maybe that's what you intended to say.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
Worth noting that what was left of the track has recently, ie within the last few weeks, been lifted and cleared at the Bradford (Wortley Jn) end.
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,503
Location
Cheshire
I'm not sure there is enough demand for a direct Bradford - Wakefield service, as even the once popular X33 service to Sheffield via Wakefield and Barnsley has fallen by the wayside and direct Arriva services aren't too frequent.

Saying that haven't VTEC said that they would like to run bi-hourly services from Forster Square by 2018? If so could these not run through Leeds and eastwards towards the ECML via the Hambleton curve giving Bradford a regular and direct service (i.e. without having the reverse), assuming of course it's electrified by then?
 
Last edited:

Condor7

Member
Joined
13 Jul 2012
Messages
1,083
Location
Penrith
Have to say I'm rather surprised there's (presumably) a business case for Wortley curve, Wakefield to Bradford is not a huge market, and as there's no longer the Bowling curve to avoid Bradford Interchange I can't see it having much use for freight. Surely the benefits of serving Leeds outweigh the extra journey time needed.

I am not sure about this, but is it something to do with the Grand Central service from Bradford, that is not allowed to pick up and drop off at Leeds?
 

Senex

Established Member
Joined
1 Apr 2014
Messages
2,956
Location
York
Surely some kind of connection between the line to Wakefield Westgate would be better, thus providing an electrified link from the Airedale line branch to Bradford (and on to London) without having to go via Leeds?

Not sure this would be possible though, looking at google maps.

You can already do that by running via Hambleton -- admittedly diesel only. But that ought to be electrified within the next ten years (assuming the expected slippage and more on the trans-Pennine electrification programme).
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,353
Location
Yorkshire
I am not sure about this, but is it something to do with the Grand Central service from Bradford, that is not allowed to pick up and drop off at Leeds?

Perhaps, but is it worth building an expensive curve for 4 services a day in each direction?
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
I am not sure about this, but is it something to do with the Grand Central service from Bradford, that is not allowed to pick up and drop off at Leeds?

Grand Central runs via Halifax, Brighouse Wakefield Kirkgate.
 

Darren R

Established Member
Joined
26 Jan 2013
Messages
1,252
Location
Lancashire
I really don't see any desperate need to reopen the Wortley Curve; it was disused for years before finally being disconnected and nobody missed it.

In any case, I think whoever thought of this idea ought to be directed to the thread about reopening the Todmorden Curve (a much more useful project) before deciding whether this is a project worth pursuing or not!
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,353
Location
Yorkshire
I really don't see any desperate need to reopen the Wortley Curve; it was disused for years before finally being disconnected and nobody missed it.

In any case, I think whoever thought of this idea ought to be directed to the thread about reopening the Todmorden Curve (a much more useful project) before deciding whether this is a project worth pursuing or not!

Quite... The Horbury curve would be far more useful than Wortley in terms of new journey opportunities for both passengers and freight. Admittedly it is a good deal longer though, so would be more expensive.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
Perhaps, but is it worth building an expensive curve for 4 services a day in each direction?

My sentiment exactly. I have been trying for the last four years to persuade Metro to reinstate the first two miles of the former Cross Gates-Wetherby line to service the 5,000 house development just started either side of the trackbed and already planned A64 P&R for approximately £17m but it has fallen on deaf ears.

This would allow turnback of Aire Valley services instead of in Leeds creating extra capacity in the west end bay platforms.

Imagine my irritation when I read Wortley Curve was to be reopened. I can't find a figure but estimate that the cost would be in the order of £15-£20m. Is there someone out there who can give a more accurate figure please?
 

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,103
Location
Near where the 3 ridings meet
Would it be of any benefit if it was linked in with a proposal to link Bradford Forster Square and Interchange?
Then a lot of freight could be removed from crossing Leeds West end.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,353
Location
Yorkshire
Would it be of any benefit if it was linked in with a proposal to link Bradford Forster Square and Interchange?
Then a lot of freight could be removed from crossing Leeds West end.

I suppose it would, but Bradford Crossrail is in whole new level of fantasy, cost-wise. The freight benefits could be served by a flyover from the Woodlesford lines (where most freight to/from the S&C originates/goes) to the Airedale lines (replacing the current Whitehall curve, to avoid crossing Leeds station throat on the level), and whilst that would still be expensive and complicated, it would be far cheaper and less disruptive than the demolition of a big chunk of Bradford city centre.
 

Condor7

Member
Joined
13 Jul 2012
Messages
1,083
Location
Penrith
Grand Central runs via Halifax, Brighouse Wakefield Kirkgate.

Yes but I think there is a new proposed service that they hoped could avoid Leeds, or at one time there was talk of going through Leeds non stop and out to the ECML that way.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,411
Location
S Yorks, usually
I have just been looking at the new West Yorkshire Integrated Authority website for information on East Leeds Parkway station and came across a statement dated November 2014 that the Wortley Curve is to be reopened to allow trains from Bradford to travel to Wakefield without entering Leeds station.

Can somebody please tell me how long the curve is from junction to junction?

Can't find any mention of it on the WYITA website - do you have a link?

I did find this PDF on the Leeds.gov.uk site
http://www.leeds.gov.uk/docs/LEH 12 Transport.pdf
on the "Leeds City Region ‘West Yorkshire Plus’ Transport Fund"
which says (in part):

The transformational schemes that have been identified for further development and investment are:
 Electrification and upgrade of all core rail routes
 Rail or tram train connections between Leeds and Bradford to Leeds Bradford International Airport
 Enhancing the quality of the local rail network through the outputs of the Yorkshire Rail Network Study including the restoration of the Wortley Curve to provide better links to Bradford from the East Coast Main Line, Wakefield and Sheffield
 Preparing the local rail network for High Speed Rail
 Expansion of the initial NGT trolleybus network to provide a core ‘rapid transit’ network
for West Yorkshire
 Full upgrade of the strategic motorway network

Note the phrasing "identified for further development and investment", which I take to mean "we'd like to look at this possibility" rather than "is to be reopened"
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,411
Location
S Yorks, usually
Looks like it from those timings, Whitehall Jn, within sight of the end of the platforms.
It's also doing Wakefield Kirkgate direct to Doncaster (via Adwick, not Pontefract) - or is that normal on Sundays anyway?
 

ASharpe

Member
Joined
4 Feb 2013
Messages
1,024
Location
West Yorkshire
Looks like it from those timings, Whitehall Jn, within sight of the end of the platforms.
It's also doing Wakefield Kirkgate direct to Doncaster (via Adwick, not Pontefract) - or is that normal on Sundays anyway?

Thanks, most trains go via Adwick all week- only those that stop at Pontefract go that way.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
Can't find any mention of it on the WYITA website - do you have a link?

I did find this PDF on the Leeds.gov.uk site
http://www.leeds.gov.uk/docs/LEH 12 Transport.pdf
on the "Leeds City Region ‘West Yorkshire Plus’ Transport Fund"
which says (in part):



Note the phrasing "identified for further development and investment", which I take to mean "we'd like to look at this possibility" rather than "is to be reopened"

You are correct, my mistake but work has already started clearing the site.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,411
Location
S Yorks, usually
I suspect the site clearance is a red herring. There's a lot of lineside clearance of various sorts going on round Yorkshire recently (opening up some views which were previously obscured by trees), but in the absence of any other information on actual funded projects, I suspect any current clearance work at Wortley is just that, clearance work/tidying up/tree removal/old track recovery, and not the first phase of anything bigger.
 