Signalling problems reported earlier at Hereford too. Wonder if that is connected.
That would be separate
Signalling problems reported earlier at Hereford too. Wonder if that is connected.
Was it this? http://www.realtimetrains.co.uk/train/O72126/2015/02/08/advanced (18:00 PLY - PAD)
As a result that has been 3 London trains (Waterloo, PLY - PAD, PNZ - PAD) in 30 minutes.
Signalling problems reported earlier at Hereford too. Wonder if that is connected.
Yawn.... Except it should never happen to them. Plenty of power cuts have 'happened' to Three Bridges ROC, yet it didn't go offline.
What do you propose? Keep all the mechanical boxes, all the PSB/ASCs? They are not as reliable as people like to make out, maintaining them is getting harder and thus more expensive. Then there is the white elephant that one day all these boxes will be life expired (infact some already are, and are one wrong move whilst changing a bulb to a complete melt down of the box![]()
)
Signalling problems reported earlier at Hereford too. Wonder if that is connected.
Don't PSBs have diesel generators (and a UPS to manage the switch) as a backup and as a last resort battery power (just long enough to get trains into the nearest station if possible)?
I believe the naionwide roc plan will allow for roc b and maybe roc c to take over roc a's data and services if roc a goes down for any reason such as power failure, security alert etc. remember that part of the basis of rocs is that a majority of the regulating is done by computer and ars with human intervention the rare occurrence rather than the everyday.
How it works in the real world is to be seen.....
Obversely not a signaller! The ROCs will control trains in the conventional manor until such as time as the technology behind TMS & IRS catches up and I for one wouldn't like to have my workstation suddenly switched to another part of the country where I'm not trained in the relevant rules, regs and SBIs.
I know how to bring a ROC to it's knees within an hour should I want to, just as anyone can who knows simple chemistry (no explosive or illegal chemicals necessary) or has a certain gadget which most people now own.
GCHQ must love your posts!![]()
You buggers could have put the date in the title! Made me think I was going to have to use the Newton Road in the rush hour!![]()
No, not a signaller and more than happy to defer to those in the loop..., but while I realise that the traffic management technology is needed, switching between rocs seems to have been considered in serious meltdown cases:
What about disaster recover, will the network* grind to a halt if a ROC is not operational?*
Well, the whole idea of creating the ROCs, and the whole idea of the technology that we are developing to support their operation, is to do with how we can build business continuity. So, with the traffic management technology it will give us the ability to switch between one ROC and another should that be desired.*
http://www.railpro.co.uk/magazine/?idArticles=2123
At my former place of work we lost power to the entire building for two days because the generator failed during a short (less than 5 minute) blackout and took the switch-over equipment with it so there was no way to switch back to AC. Once the UPS batteries died there was nothing.Don't PSBs have diesel generators (and a UPS to manage the switch) as a backup and as a last resort battery power (just long enough to get trains into the nearest station if possible)?
Except there is no spare workstations planned to be put into ROCs, how do you deal with level crossing controls and monitors? They are 2 physical barriers to overcome.
I believe the naionwide roc plan will allow for roc b and maybe roc c to take over roc a's data and services if roc a goes down for any reason such as power failure, security alert etc. remember that part of the basis of rocs is that a majority of the regulating is done by computer and ars with human intervention the rare occurrence rather than the everyday.
How it works in the real world is to be seen.....
I'm just quoting from the interview between railpro and the guy implementing the rocs, maybe it was all a lie......
A 'maybe' able to work B, although I have my doubts, but there will be no one to do it, not enough staff, I iamagine ROC's will be run with 'just enough' staff, and anyway there will not be enough, if any staff with the knowledge to actually work it
Has ROC implementation so far resulted in any reductions in signallers' positions compared with the previous PSBs?I also can't see how TM will have the envisaged cuts in signalling staff that they say they will. That's from what I have seen with my own eyes, and a lot of people think the same.
Has ROC implementation so far resulted in any reductions in signallers' positions compared with the previous PSBs?
Has ROC implementation so far resulted in any reductions in signallers' positions compared with the previous PSBs?
Just wait till progress sees this happen to a ROC...
I completely agree, but my point was specifically about the number of signallers positions. I vaguely recall someone telling me that positions in the West of England being transferred to Didcot actually will result in an increase!You could argue that regardless of the numbers, you're still forcing those who want to stay to move across the country to keep their jobs.
e.g. the signallers in Devon/Cornwall/Somerset will have to up sticks to Oxfordshire if Didcot takes it all over as planned, and the resultant loss to the local economies
(and the potential loss in local knowledge by having to employ people locally to run trains hundreds of miles away in places they've possibly never visited)
I completely agree, but my point was specifically about the number of signallers positions. I vaguely recall someone telling me that positions in the West of England being transferred to Didcot actually will result in an increase!