deltic
Established Member
- Joined
- 8 Feb 2010
- Messages
- 3,716
Network Rail website has the engineering works between London Euston and Watford that were planned for 14-15 Feb as cancelled but the alterations on the 16 Feb remaining. Is this still the case - meant to be travelling to Manchester on 16th and the revised timetable is showing and with no advance tickets available