Ash Bridge
Established Member
It's razed!
To raise is to go up, to raze is to go down.
That's your spelling lesson for today folks!![]()
Oops, so it is
It's razed!
To raise is to go up, to raze is to go down.
That's your spelling lesson for today folks!![]()
Agreed it isn't down to Network Rail, Network Rail operates as a business if someone whether that be the government or a third party comes up with the silly amount of money NR will want you will find that NR will reinstate it
Like any other project NR will look to make a profit from the project
In terms of whether it will be cost effective the fact that there is only 6 buses on that route a day speaks volumes on demand for such a project to succeed, the fares for the line will be have to be competitive against the bus prices so that just leaves the ratio of a return on the investment
You look at other parts of the country like Kings Lynn to Hunstanton, Stagecoach send three buses an hour to Sunny Hunny, First Group send 2 buses an hour to Swaffham, Stagecoach also send 3 buses an hour to Spalding all services all year round and still there is no chance of these lines being reinstated, so with Buxton's 6 buses a day me thinks its a dead duck ??????
What Derby terminating services? They regular hourly one from London was extended through to Sheffield a couple of years ago. So a through London train would need another path out of St Pancras, not to mention platform capacity there.
I though, there were some Derby terminating services, but mainly to get the units back to Derby for maintenance overnight etc.
The paths out of St Pancras will have to be re-thought in the future with HS2 and electrification effecting them, so it's not impossible.
It would be perfectly possible to have a curve into the current station, in fact a hundred years ago their was just such a curve. The orignal curve linked the existing station to the ladmanlow line, but the principle would be same. Google earth shows the rignal start of the curve still exists in the form of wall curving off the viaduct approach towards the existing station
The issue would be the severity of the curve, as the sKew of the bridge would be restricted by the line pasing through the viaduct before crossing the new peak rail bridge.
The site is actually quite flat, so don't see any issues with levels.
If the National Parks are going to stand in the way of reopening important railway routes, they should have their responsibility for them removed.
Chaps it all comes down to how strong the market is from the rest of Derbyshire to Buxton. Given that all of Buxton's commercial links are with Greater Manchester is that honestly going to change if you reinstate the junction from Millersdale?
Indeed, a reinstated St Pancras to Manchester service would also have to compete for scarce paths into Manchester Piccadilly, via either Stockport or Ashburys.What Derby terminating services? They regular hourly one from London was extended through to Sheffield a couple of years ago. So a through London train would need another path out of St Pancras, not to mention platform capacity there.
There is talk of another fast train on the Hope Valley each hour once Northern Hub capacity works are complete. This could possibly run from Manchester or Liverpool to Derby or somewhere beyond via the Dore South Curve. Sending it via Bakewell instead would speed it up a bit, but only if it was limited stop (say Bakewell and Matlock). Opening the other stations would need an extension of the Matlock stopping service, which could perhaps go to Buxton instead of Manchester.
Of the former stations on the route only Bakewell serves more than a village, and the station is half a mile from the centre up a steep hill. The buses run down the main street.
In fact, the opposite is true, the very curved line from the Midland Route up into "Donaroo" sidings (currently Buxton Headshunt) is quite a steep climb, plus the original route into the Midland Station went under the Ashbourne branch from the LNWR station means that it is virtually impossible to run directly from Ashwood Dale into Buxton LNWR.
As others have said, the original route into the Midland terminus has been lost to Aldi, its carpark, and the town-centre bypass. The platform that Peak Rail built is a couple of hundred yards short of the original platform.
Buxton Midland 1992 by Ex BR Signalman1As others have said, the original route into the Midland terminus has been lost to Aldi, its carpark, and the town-centre bypass. The platform that Peak Rail built is a couple of hundred yards short of the original platform.
Do I also take it from this statement that you would also relax any restrictions on quarrying that exist in areas inside a National Park on the grounds of the value to the nation of the stone that can be abstracted?
--
There are only four through bus services a day from Derby to Manchester. The current transpeak services are tendered routes and subsided by the county council. Timekeeping is horrendous and the fares astronomical. It takes over three hours on the bus from Derby to Manchester. The A6 is a shocking route that is prone to severe congestion in the summer between Cromford and Matlock. A through rail service makes sense but not via Buxton. The original mainline went through millers dale and Chinley I believe. This is the direct route between Derby and Manchester that needs reopening.The Derby to Manchester Trans Peak service serving Matlock, Bakewell, Buxton, Stockport appears to operate an hourly service in both directions.
There are only four through bus services a day from Derby to Manchester. The current transpeak services are tendered routes and subsided by the county council. Timekeeping is horrendous and the fares astronomical. It takes over three hours on the bus from Derby to Manchester. The A6 is a shocking route that is prone to severe congestion in the summer between Cromford and Matlock. A through rail service makes sense but not via Buxton. The original mainline went through millers dale and Chinley I believe. This is the direct route between Derby and Manchester that needs reopening.
It's razed!
To raise is to go up, to raze is to go down.![]()

Do I also take it from this statement that you would also relax any restrictions on quarrying that exist in areas inside a National Park on the grounds of the value to the nation of the stone that can be abstracted?
Rules for quarrying inside national parks have always been relaxed. They just change the boundary of the national park. Like near Buxton, or the most obvious, Blaenau Ffestiniog
Indeed, a reinstated St Pancras to Manchester service would also have to compete for scarce paths into Manchester Piccadilly, via either Stockport or Ashburys.
I don't know how many paths are used/available out of Ashburys but can't believe it is "full"? Reinstatement of 4 track Ashburys to Guide Bridge/Hyde North junction would also be both possible and give extra capacity for looping/overtaking.
Alternatively, Ashburys to Victoria via current freight only line is one possibility, or a short reinstatement of the chord from Guide Bridge to Ashton moss chord which is mulled over every now and again.
We can hope!
Are there not to be soon some new high-frequency services of a semi-fast nature between Manchester Piccadilly and Leeds that will require paths along the Ardwick to Guide Bridge section of this route before they take the line bifurcation towards Stalybridge?
https://www.derbyshire.gov.uk/images/derby-mancester-rail_main_report_full_tcm44-21359.pdf
I don't know if this has been posted before, but I haven't read back through all the thread. It is a study released in 2004. It concluded that the best option would be an hourly service to Buxton, but the benefit: cost ratio would only be favourable in 2025. As for my precious Monsal Trail, they conclude it would be impossible to coexist with trains but suggest a new one be built along the lines of existing paths but would not be totally segregated from roads. I've just skim-read 85 pages in half an hour so forgive any inaccuracies.
By the time they've planned and built it, 2025 isn't that far off at all.
By the time they've planned and built it, 2025 isn't that far off at all.
TfGM's Tram-train Strategy envisages up to 10tph to Marple via Bredbury:I don't know how many paths are used/available out of Ashburys but can't believe it is "full"?
Reinstatement of 4 track Ashburys to Guide Bridge/Hyde North junction would also be both possible and give extra capacity for looping/overtaking.
Alternatively, Ashburys to Victoria via current freight only line is one possibility, or a short reinstatement of the chord from Guide Bridge to Ashton moss chord which is mulled over every now and again.
We can hope!
www.transportforgreatermanchestercommittee.gov.uk/tfgmc/download/downloads/id/4702/item_08_tram-train_strategyIt is recommended that Marple be developed as a potential Phase 1 of a
Greater Manchester tram-train strategy, comprising the best-performing
routes. For a six-minute headway service in which Marple services
operated alternately to Altrincham and Bury, it is estimated that
approximately 24 new tram-train vehicles would be needed, although
many other service patterns would be possible, and so vehicle
requirements at this stage are uncertain.
TfGM's Tram-train Strategy envisages up to 10tph to Marple via Bredbury:
www.transportforgreatermanchestercommittee.gov.uk/tfgmc/download/downloads/id/4702/item_08_tram-train_strategy
This would restrict the scope for express passenger services on the Marple line, whether from the Hope Valley line or from the reopened MML, since all remaining heavy rail services would have to be routed via Hyde and Guide Bridge, and share the double track Goyt Valley viaduct with the tram-trains.
Personally I believe while trams are fine for urban mass transit, short spaced stops, if they stop heavy rail and inter-urban services being run/developed they shouldn't happen.
That depends whereabouts in Manchester you are going, and what time you need to get there. Off peak, there is a 43 minute gap between trains from Ashton to Victoria. The tram takes longer, but is every 12 minutes and may get you closer to your destination.How long for tram from Ashton vs the train?
What is interesting is that the authors considered the most effective solution was an hourly Buxton stopping service at 50 mph by effectively joining the Derby to Matlock to the Buxton-Manchester services, whereas most on this thread consider the Derby-Manchester expresses via Chinley more viable.
What is interesting is that the authors considered the most effective solution was an hourly Buxton stopping service at 50 mph by effectively joining the Derby to Matlock to the Buxton-Manchester services, whereas most on this thread consider the Derby-Manchester expresses via Chinley more viable.
Maybe so, but the alternative use proposed here involves a reopening for which the word hypothetical probably implies an unwarranted degree of certainty.
Some of the stops on the Marple line have the same sort of spacings as those on the Altrincham line and tram-train has the potential to provide a much improved service comparable to that on the Metrolink routes. While it will use some capacity on the Bredbury route (where alternative routes are available) it frees some up in Piccadilly station thus creating some other opportunities.
Considering this proposal would screw up Hope Valley services, regardless of whether the line through Matlock reopened or not, it would be irresponsible in the extreme for the authorities to consider taking this proposal forward.
This gets confusinger and confusinger, as it were. I thought I read somewhere that one way of increasing trains on the Hope Valley to Manchester corridor was to send an extra fast train to Victoria via Romily, building a passing loop at Grindleford. How would that sit with a Marple tram/train, let alone the HV stopper?
This gets confusinger and confusinger, as it were. I thought I read somewhere that one way of increasing trains on the Hope Valley to Manchester corridor was to send an extra fast train to Victoria via Bredbury, building a passing loop at Grindleford. How would that sit with a Marple tram/train, let alone the HV stopper?
EDIT: that's an extra, fast train, not an extra-fast train!