• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Creation of class 230 DEMUs from ex-LU D78s by Vivarail

Status
Not open for further replies.

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
That's because it is one of the doors that will be take out of use in that configuration. All trains apart from the "commuter" variant will be the 2 end doors only, with the other 2 locked off. Interesting to see that there will be seats for those who enjoy looking out of the window.

D-Stock-Seat-Bay-With-Tables-1024x576.jpg
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,503
Location
Cheshire
Hmmm, will they be properly sealed or just out of use? Imagine the drafts through them if they weren't. Cheap and nasty springs to mind. :|
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,533
Location
"Marston Vale mafia"
Hmmm, will they be properly sealed or just out of use? Imagine the drafts through them if they weren't. Cheap and nasty springs to mind. :|

It refers to "door replacement panels" so I don't see why they wouldn't be properly sealed.

This sort of thing is done all the time to buses leaving London for the provinces, and done well you can barely tell there was ever a door there. (I expect there are structural reasons for needing to keep the pillars).

Neil
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,503
Location
Cheshire
Well either way they look awful. And given the state of some ex TfL buses that land oop North the prospect of ex-D stock rattling around doesn't exactly inspire.
 

Feathers44

Member
Joined
12 Aug 2014
Messages
378
I didn't think they looked that bad (particularly when compared to their present incarnation).
 

GatwickDepress

Established Member
Joined
14 Jan 2013
Messages
2,588
Location
Leeds
Those are some massive gaps between the seats. Makes sense considering there's no space for overhead luggage racks.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Those are some massive gaps between the seats. Makes sense considering there's no space for overhead luggage racks.

If anyone proposes putting them on the Mid-Cheshire or Hope Valley lines (and probably other lines with village stations) they'll be people demanding there is a bicycle rack which can take 4 bicycles.
 

Murph

Member
Joined
16 Feb 2010
Messages
728
Well either way they look awful. And given the state of some ex TfL buses that land oop North the prospect of ex-D stock rattling around doesn't exactly inspire.

They look ok to me. My only criticism is the exterior cab end shown. I don't think they need the modern plastic glued over the existing end. I think if you're going to do a project like this, it's better to just give them an honest face (i.e. give the original face a decent paint job and just the minor adjustments needed to lights, etc), and not try to disguise what's underneath. I think that the honesty of presenting them as a thoroughly refurbished and modernised old train is something that the general public can respect if it's providing good service for them, without the plastic surgery.

As long as there's some decent padding on those seats, I could see them as being a possible step up from an unholy union of a bus and a freight wagon. ;)
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,533
Location
"Marston Vale mafia"
I didn't think they looked that bad (particularly when compared to their present incarnation).

I think they look fine. Indeed if Bletchley could get 3 sets (2 to use and one spare) they could perhaps release a 150 and a 153, and avoid needing to go all the way back to Brum if you need a spare when one of them inevitably conks out. And this is similarly a route that needs interim DMU stock because it's going to get wired within 20 years (as part of East West Rail).

Neil
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
That looks surprisingly good, apart from that hideous front end... Though once you allow for the space needed for a power unit above the floor; and the fact that each vehicle is 17m long (so longer than a Pacer car but shorter than a 150) I can't see much use for a 2-car set.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,533
Location
"Marston Vale mafia"
That looks surprisingly good, apart from that hideous front end... Though once you allow for the space needed for a power unit above the floor; and the fact that each vehicle is 17m long (so longer than a Pacer car but shorter than a 150) I can't see much use for a 2-car set.

The engines are going *under* the floor. The above floor power was another idea.

Neil
 

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
They look ok to me. My only criticism is the exterior cab end shown. I don't think they need the modern plastic glued over the existing end. I think if you're going to do a project like this, it's better to just give them an honest face (i.e. give the original face a decent paint job and just the minor adjustments needed to lights, etc), and not try to disguise what's underneath. I think that the honesty of presenting them as a thoroughly refurbished and modernised old train is something that the general public can respect if it's providing good service for them, without the plastic surgery.

As long as there's some decent padding on those seats, I could see them as being a possible step up from an unholy union of a bus and a freight wagon. ;)

I suspect the changed front end is to do with improving the crash worthiness.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
The engines are going *under* the floor. The above floor power was another idea.

Neil

Oh ok. I'm surprised there's room for an engine that meets emissions regulations under there!

I suspect the changed front end is to do with improving the crash worthiness.
...
My God that's ugly!

I don't doubt that some work would be needed to the front, above and beyond painting it yellow...

But is there a need for it to be so grotesque as to scare trespassers away?
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,284
Location
Bolton
I'm confused.

So this tinpot madness actually is going to happen?

'CONVERSION IS GO' from Rodger Ford must have annoyed Ian Walmsley :p
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,362
Location
Yorks
Going by the images, the apparent large numbers of facing seats with tables would definately be an improvement (lack of tables on Northern's 144's and 150's is an unnecessary and unjustified oversight IMO).

They do appear to suffer from that unfortunate modern disease, thin seat syndrome though.

That said, I would welcome a return to British Rail style stripey moquette as the graphics seem to imply :D
 
Last edited:

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
Going by the images, the apparent large numbers of facing seats with tables would definately be an improvement (lack of tables on Northern's 144's and 150's is an unnecessary and unjustified oversight IMO).

They do appear to suffer from that unfortunate modern disease, thin seat syndrome though.

That said, I would welcome a return to British Rail style stripey moquette as the graphics seem to imply :D

I was surprised by the tables too. I do wonder if 365-style small tables would be a better idea though, as if they're 2/3x17m there'll be overcrowding at peak times on routes such as the Penistone line. Anything more than 4-car would need platform extensions there though, and the bay (P2) at Huddersfield might be tricky.

As for the moquette, something about it reminded me that what I was looking at was Designed stock. Not sure why though, as it doesn't look like anything that ever appeared on them!
 
Last edited:

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,362
Location
Yorks
I was surprised by the tables too. I do wonder if 365-style small tables would be a better idea though, as if they're 2/3x17m there'll be overcrowding at peak times on routes such as the Penistone line. Anything more than 4-car would need platform extensions there though, and the bay (P2) at Huddersfield might be tricky.

As for the moquette, something about it reminded me that what I was looking at was Designed stock. Not sure why though, as it doesn't look like anything that ever appeared on them!

That's a point. They might need a few more airline seats in that case, but the tables are still fundamentally a good idea.

I hope they've checked these things structurally as once they're converted, they'll be with us a lot longer than the intended design life !
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
The layout in the pictures seems to be the 3 car 'Country' layout with seating sacrificed for good window views, the other two configurations are much denser.

D-Train_configuration.jpg
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,362
Location
Yorks
The layout in the pictures seems to be the 3 car 'Country' layout with seating sacrificed for good window views, the other two configurations are much denser.

D-Train_configuration.jpg

Well, if they're going to Northern, they could end up on any.

Perhaps a mixture of configurations within the set might work ?
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,503
Location
Cheshire
Somehow I doubt if this project ever went ahead that the tables would see the light of day. Even the seating configuration would probably be altered.

But the simple fact remains. These look like old stock tarted up, which is exactly what they would be. Roll those monstrosities out and expect an awful lot of negativity and bad press, and frankly a short shelf life. They will end up being ditched sooner rather than later, trust me. So why waste time and money on this and bite the bullet by getting one final new DMU order ready for all TOCs that will need them for the next 30 years.

If no-one wants the D-stock as they are do them a favour, melt them down and turn them into truly new trains not just mutton dressed as lamb.
 

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,319
Wouldn't it be cheaper to simply convert them into 3rd rail emu's?
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
As much as this is a good idea and yes cycles racks need to be included within it, I am concerned as to whether the chassis of the D-stock would in a state where a new train could be built on to it? If this train is to go a-head, I think actions needs to be taken now on the D stock to sort out any corrosion given the work that was needed on the Class 460's to change them into 458/5's.
 

1018509

Member
Joined
5 Jun 2011
Messages
329
Location
New Milton
This ain't going to happen.

D stock were built down to a standard and I doubt they would ever withstand the rigours of heavier rail work.

Based on no information at all but several years working with 1973 stock (a similar design but tube sized) which has been cracking up since day one. Still a basically good tube train though.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,786
Location
Somewhere, not in London
As much as this is a good idea and yes cycles racks need to be included within it, I am concerned as to whether the chassis of the D-stock would in a state where a new train could be built on to it? If this train is to go a-head, I think actions needs to be taken now on the D stock to sort out any corrosion given the work that was needed on the Class 460's to change them into 458/5's.

The D78 is an aluminum extrusion with two bolsters, structural members and some very significant corrugations in the flooring, provided it is done properly, it is a very versatile bodyshell, no specific hard mounting points, other than structural ones for the doors, roof, body end etc have been put in, so technically, everything is movable.

The D78s are also not built anything like the 1973TS, being an extrusion rather than fabricated together.

Given that it is predominantly aluminum and the refurbishment included new bogies, I don't think that corrosion is much of an issue, or they wouldn't be looking at doing all this work.

PS: The doors do have some pretty huge aluminum structure around them that it really isn't advisable to remove, answering something from a while back there.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,334
They might make a useful shortish-term replacement (15 or so years) for Pacers on selected lines, but I think they need decent seating (mainly 2+2), rather than expect hordes of passengers to stand. It would also be preferable to use 4 coach formations rather than 3. At about 18 m. coach length, a 4 coach formation would only be slightly longer than 3 car 158s or 185s.

Lines for which they might be suitable ? Those with low speed limits, or where most of the stations are closely spaced, and speeds between stations often don't reach 60 mph., e.g.

Leeds - Harrogate - York
Huddersfield - Barnsley - Sheffield.
Manhester Victoria - Atherton - Wigan Wallgate / Kirkby
Bishop Auckland - Darlington - Saltburn
Barrow - Workington - Carlisle (but only if totally separated from the Preston/ Lancaster - Barrow services; between Preston & Lancaster, a 60 mph unit would take nearly 10 minutes longer than 390s, 221s or 185s, and create pathing problems.)
 

chorleyjeff

Member
Joined
3 May 2013
Messages
677
They might make a useful shortish-term replacement (15 or so years) for Pacers on selected lines, but I think they need decent seating (mainly 2+2), rather than expect hordes of passengers to stand. It would also be preferable to use 4 coach formations rather than 3. At about 18 m. coach length, a 4 coach formation would only be slightly longer than 3 car 158s or 185s.

Lines for which they might be suitable ? Those with low speed limits, or where most of the stations are closely spaced, and speeds between stations often don't reach 60 mph., e.g.

Leeds - Harrogate - York
Huddersfield - Barnsley - Sheffield.
Manhester Victoria - Atherton - Wigan Wallgate / Kirkby
Bishop Auckland - Darlington - Saltburn
Barrow - Workington - Carlisle (but only if totally separated from the Preston/ Lancaster - Barrow services; between Preston & Lancaster, a 60 mph unit would take nearly 10 minutes longer than 390s, 221s or 185s, and create pathing problems.)

From observation there is plenty of capacity North of Preston and when driving at 70mph on the M6 alongside the railway the 185s and 390s are not going much faster. How do you get a 10 minute difference?
 

al.currie93

Member
Joined
27 Jun 2013
Messages
381
I'm personally glad this is happening. Reuse of existing machines that do their current job well that saves resources; I approve!

On another note, can anyone provide any information on "Vivarail", such as where they're based, who owns them, what else they/their owners do and so on? I can't seem to find much at all...
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,841
Location
Epsom
On another note, can anyone provide any information on "Vivarail", such as where they're based, who owns them, what else they/their owners do and so on? I can't seem to find much at all...

Here you are:

http://companycheck.co.uk/company/08661726

The address is in there, and the list of directors, but no accounts yet as it isn't old enough to have filed any.
 
Last edited:
Status
Not open for further replies.

Top