59CosG95
Established Member
http://www.networkrail.co.uk/long-t...wessex-route-study-draft-for-consultation.pdf Interesting how they've included wiring to Salisbury!
This Wessex Route Study seeks to establish the required capacity
and capability of the railway, from a systematic analysis of the
future requirements of the network. It seeks to accommodate the
conditional outputs articulated in the Long Term Planning Process
(LTPP) Market Studies, whilst maintaining operational performance,
and at a cost acceptable to funders and stakeholders.
Network Rail is developing a programme of Route Studies, in
conjunction with rail industry partners and other stakeholders. This
programme of geographic Route Studies runs alongside
development of Network-wide Route Utilisation Strategies. These
review national issues such as stations, depots, rolling stock and
electrification. A Freight RUS will provide a strategy for networkwide
freight issues such as gauge, train length, axle weights and
freight electrification....
). Faffing about with loops at Whimple when we are discussing up to the year 2043 is just not credible. The whole line Exeter to Salisbury needs redoubling and more besides, if two tier metro-local / express services are envisaged, which they are in this document.