EM Parkway was also proposed in connection with HS2:
http://www.rushcliffe.gov.uk/media/...mber/3deccabinet/Item 10 HS2 consultation.pdf
I don't know the current status, nor if the review of the HS2 stop in the area will look at EM Parkway.
Further into the future, the power station site is expected to become available for redevelopment.
So although patronage is on the low side now, potential changes in the vicinity are inline with the original expectations.
That is very interesting.
The 2012 HS2 Phase 2 Options Report states:
East Midlands Parkway also sits within the Green Belt. Rushcliffe Borough Council indicated that this designation was not likely to be reviewed. This would mean that development around East Midlands Parkway would not be supported. This restrictive planning framework was felt to be a significant differentiating factor compared to the potential for development around a station at Toton.
https://www.gov.uk/government/publications/options-for-phase-two-of-the-high-speed-rail-network
So it appears that one of the reasons a HS2 station at East Midlands Parkway was previously dropped was the attitude of Ruscliffe Council!