Given that GW will have a load of 16x's which are due to be freed up due to IEP and Electrification, how viable would it be to remove some central coaches from the three coach sets and inserted into other sets to produce 4 coach sets?
Such a set could be very useful on the Reading/Gatwick services which can often be fairly busy but many of the stations probably couldn't cope with trains which are much longer than at present.
This then leads to the question as to how useful such a long set would be on the other remaining DMU services near Reading and how useful a few more 2 coach sets would be out west where the 16x's are rumoured to be heading?
Such a set could be very useful on the Reading/Gatwick services which can often be fairly busy but many of the stations probably couldn't cope with trains which are much longer than at present.
This then leads to the question as to how useful such a long set would be on the other remaining DMU services near Reading and how useful a few more 2 coach sets would be out west where the 16x's are rumoured to be heading?