• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Grand Central Electric Locomotive?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,614
I'm not sure Crofton depot has an electrified route to it? My guess is duff info.
 

Adam0984

Established Member
Joined
18 Feb 2014
Messages
1,213
Possibly the 180 that failed at Kings Cross yesterday afternoon
 

theblackwatch

Established Member
Joined
15 Feb 2006
Messages
10,889
Morning,

I was having a look at RTT to see if there was anything worth popping out for at lunchtime and came across the following.

http://www.realtimetrains.co.uk/train/O31077/2014/09/16/advanced

It is down as an electric locomotive. Would this be correct and if so what is it likely to be as Grand Central don't have any electirc locos?

Or is it more likely to be duff info entered into the system?

Ta

It isn't down as an electric locomotive, it has been given the timings of one - there is a subtle difference! Just because a train is timed as a particular type of power/speed doesn't mean it is the booked or expected power.
 

thegrimeater

Member
Joined
9 Apr 2013
Messages
67
Location
St Ives, Cambs
It isn't down as an electric locomotive, it has been given the timings of one - there is a subtle difference! Just because a train is timed as a particular type of power/speed doesn't mean it is the booked or expected power.

I was aware that when RTT gives a type it is just what the schedule is timed for. I was under the impression that the electric loco/diesel loco(which I know is also used for steam) was accurate as that was used to stop electric locos being sent up non electrified lines.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
I expect the timing load was changed once it got to any non electrified section as there wouldn't be runninhg times for it, called a change en route, I don't think RTT shows them.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,493
Location
Yorkshire
Apears not to have run anyway
"This service was cancelled throughout due to a problem at the depot (MU)."
I guess they found the wires, of lack of, may be an issue :P
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,382
Location
Yorkshire
It is down as an electric locomotive.
It's not. It has initially had a timing load for an electric locomotive applied to it.
Or is it more likely to be duff info entered into the system?
Not that either.

It's a problem with how people interpret the way that this website displays the information. Arguably, if the website made it clearer that the data it's showing is a timing load, then people would be less likely to be confused.

For an explanation see this post by D6700.
 

thegrimeater

Member
Joined
9 Apr 2013
Messages
67
Location
St Ives, Cambs
It's not. It has initially had a timing load for an electric locomotive applied to it.

Not that either.

It's a problem with how people interpret the way that this website displays the information. Arguably, if the website made it clearer that the data it's showing is a timing load, then people would be less likely to be confused.

For an explanation see this post by D6700.

Thank you. As I explained earlier I understood timing loads eg timed for Class 158 Super Sprinter. I had thought that the diesel/electric loco entry was to prevent electric being sent up non electrified lines and therefore accurate as to the method of propulsion(steam excepted). Clearly I was wrong...
 
Status
Not open for further replies.