Euston fiasco today

Status
Not open for further replies.

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,596
Location
Isle of Man
Apparently significant signalling problems at Bushey have caused the job to stop for hours this afternoon. Things are running again but still seriously delayed.

Does anyone know what the problem was? Right now all I can see is network rail incompetence, given that this area is just what they've spent weeks and weeks "upgrading". I'm assuming not a theft as they kept saying it was about to start working again, before failing.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,452
Interestingly in the National Rail Enquiries disruption page they don't state Tring services from and to Euston are all cancelled. When South West Trains have services cancelled they are very good at explaining which ones.

When I use to work in Harrow it wasn't uncommon for the cancelling of Tring services to get ignored in such disruption information. Sometimes they got mentioned but very hit and miss.

http://www.nationalrail.co.uk/service_disruptions/82636.aspx
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
Complete loss of signalling from Euston to Bushey on all lines. Bushey is the fringe on the Watford job so not necessarily anything to do with that.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,596
Location
Isle of Man
Getting information about which trains will stop at Apsley and Kings Langley is always a nightmare in disruption. They forget about those two stations, and Cheddington, and its frustrating when stop orders aren't put in place for the trains that do run. We saw that on Sunday when there was a two hour gap in trains because of problems further north.

The Twitter feed is often the only way to get any info, even when you're on the concourse at Euston.

I'm glad I gave up quickly and came back via Amersham and a lift, but seriously not impressed!
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
My mother was caught up in it, to reach Wigan she was diverted onto the MML on a Sheffield service, NR was advising that WCML tickets would be honored on the MML and the ECML.
 
Last edited:

dcsprior

Member
Joined
28 Aug 2012
Messages
862
Location
Edinburgh (Fri-Mon) & London (Tue-Thu)
Arctic Troll said:
Does anyone know what the problem was? Right now all I can see is network rail incompetence, given that this area is just what they've spent weeks and weeks "upgrading".

I know the sweet-FA about railway technology, but when it comes to kit in other areas, it's common to see a high level of faults on newly-commisioned equipment - the phrase 'bathtub curve' is used to describe high failure rates of new and old kit, with a generally reliable period inbetween.
 

GadgetMan

Member
Joined
9 Jan 2012
Messages
980
this area is just what they've spent weeks and weeks "upgrading".

The work isn't finished. The new signals haven't been commissioned yet and both Watford North and South require more work.

Network Rail didn't get the block they wanted so work is now being done in dribs and drabs.

No idea what the cause of todays delays was.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
5800 delay minutes attributed to this by this morning. Looks like a UPS failed.
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,411
Location
Glasgow
Looks like a UPS failed.

Then that design should be publicly dishonoured and stripped of its title in a ceremony in the presence of rail commuters as it evidently is wishfully rather than accurately named. :D
 
Last edited:

talltim

Established Member
Joined
17 Jan 2010
Messages
2,454
We have more UPS failures than power failures at my place. They normally take longer to fix than waiting for the power to come back on too.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Essentially either a large battery or diesel generator that will kick in either immediately or within seconds of mains electricity supply being lost and provide a few hours of backup of power.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,923
Location
Mold, Clwyd
Then that design should be publicly dishonoured and stripped of its title in a ceremony in the presence of rail commuters as it evidently is wishfully rather than accurately named. :D

Remember the WCML upgrade was done on the cheap - it only cost £8bn.:cry:
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Indeed, work was descoped to remain within target budget rather than the budget increased to achieve the original outputs.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,452
Well it doesn't matter. NR will pay compensation to the TOCs for the delays and then things can return to normal until something else happens.
 

carriageline

Established Member
Joined
11 Jan 2012
Messages
1,897
Signalling went down at half 2, the UPS had already failed and was being looked at when the crash happened. The TD system didn't come back up (train descriptions were all over the place :lol:) and trains were being described with post it notes, then the system went down again about 15:30


Sent from my iPhone using Tapatalk
 

oversteer

Member
Joined
26 Jan 2011
Messages
742
Highlight of the evening for me was the 1813 which spent about 5 minutes being switched between platforms 8 and 11 with an ever changing list of station calls
 