ryan125hst
Established Member
Could anyone describe in detail what the procedure for coupling and uncoupling East Midland Trains' Class 158 units on the Norwich to Liverpool route at Nottingham route please?
I know, from looking on Realtime trains, that Norwich bound trains usually use platform 3, with the unit to Norwich leaving after the uncoupling, and the empty unit shunting off to Eastcroft shortly afterwards. In the other direction, the ECS shunts into platform 7B (behind the CrossCountry Class 170 to Birmingham), which the in service Liverpool bound unit then coupled to. The four car unit then leaves about 4 minutes after the XC unit departs. (It must get interesting if the XC service doesn't leave on time!)
What I'm unsure of is how it works with things like doors being open etc. I caught the 17:45 to Liverpool as far as Sheffield a couple of weeks ago, but there were only two cars on the service (as far as I know anyway!), so I didn't see this procedure). Are passengers allowed to board the empty unit before the other unit attaches. Do the doors need to be locked again before the attachment is made? How about when the units uncouple?
There doesn't seem to be many videos of it on YouTube!
Many thanks!
Ryan
I know, from looking on Realtime trains, that Norwich bound trains usually use platform 3, with the unit to Norwich leaving after the uncoupling, and the empty unit shunting off to Eastcroft shortly afterwards. In the other direction, the ECS shunts into platform 7B (behind the CrossCountry Class 170 to Birmingham), which the in service Liverpool bound unit then coupled to. The four car unit then leaves about 4 minutes after the XC unit departs. (It must get interesting if the XC service doesn't leave on time!)
What I'm unsure of is how it works with things like doors being open etc. I caught the 17:45 to Liverpool as far as Sheffield a couple of weeks ago, but there were only two cars on the service (as far as I know anyway!), so I didn't see this procedure). Are passengers allowed to board the empty unit before the other unit attaches. Do the doors need to be locked again before the attachment is made? How about when the units uncouple?
There doesn't seem to be many videos of it on YouTube!
Many thanks!
Ryan
It's interesting to see that passengers are allowed to alight from the rear unit before the coupling has taken place on East Midlands Trains, whereas on South West Trains, a sister company, passengers have to wait until the trains are coupled before the doors are released.