You are both (HST Ed and Bald Rick) making the assumption that the current historically and previously unimaginably low interest rates will remain at this level for the next 30 years. To be fair the accounting methods allow you to, so I maintain that the accounting methods artificially favour bridges over level crossings.
Another thing that will change very soon is the formal nationalisation of Network Rail which will mean every penny they borrow goes onto the national debt. Expect the treasury to favour the level crossing because it means £20 million off the national debt and generally put pressure on to cut investment packages to the minimum to keep borrowing down, just as they did with BR, even when the higher cost solution would have led to much reduced ongoing operating costs. Lets hope we don't go back to single lead junctions and singling odd short bits of line like Moreton to Dorchester.
However a lot of this boils down to an argument over what is reasonably practicable which would occupy a 150 page thread of its own...
Bald Rick is right that the BR civil engineer could keep costs lower by losing costs in overheads. He could also call upon engineers of all disciplines who knew the area like the back of their hand (including the closed bits which the BR civil engineering department still maintained unless the trackbed was sold off - little was outside urban areas - I remember in my first days on the railway helping install a phone in the local ACE office and seeing a map on the wall with all the closed bits and anotations on the closed bits for tunnels/viaducts etc.)
Feasibility study would have been a couple of inter disciplinary meetings followed by the various departmental engineering reps spending a day or so doing a budgetary estimate and short report which the BR project manager would have packaged up in another day or two. In other words it could be done with a lot less work too because the knowledge was in house, athlough in recent years Network Rail has begun to taken more and more back in house. Closed lines are now owned by BR residuary or whatever they are now called and maintained by someone else.
I'm not sure deterioration of structures over the last 25 years would have made that much difference as the main structure, the bridge over the Ouse had already gone (and was I think the excuse for closing the line -the real reason was I am led to believe that East Sussex council didn't want to fork out for a bridge on their new Lewes relief road (Phoenix Causeway), just as they don't much want the cost of forking out for a Bridge on the Uckfield Bypass now. I'm told - I was too young myself - that the road was built up to either side of the viaduct while they waited for the line to close so the viaduct could be flattened - but that might be an urban myth).
BR also owned the rolling stock and therefore often had a spare unit or two they could store long term without paying leasing charges, so finding an extra Thumper to extend the service to Lewes would not have been difficult. Similarly if they wanted a weekend possession they just booked it at the cost of the Area Manager getting cross rather than £thousands in compensation to a TOC.
I think it will happen eventually (a change in party running the county might help), the Lewes loop idea makes direct trains to Brighton feasible, but the BML2 lot seem to be living on another planet so long as they advance crackpot ideas like ripping up Tramlink and running via Elmers End, these seem to come out of the same magic cookie jar as the short lived attempt for a preserved railway at Addiscombe where someone advocated running an Addiscombe to Heathrow Airport service via some heath robinson route.
Personally I think a new alignment turning off at Isfield and dropping down to a Brighton facing junction at Glynde with an intermediate station at Ringmer would be a better solution but probably cost too much. In the meanwhile please someone get on and electrify it.
Another thing that will change very soon is the formal nationalisation of Network Rail which will mean every penny they borrow goes onto the national debt. Expect the treasury to favour the level crossing because it means £20 million off the national debt and generally put pressure on to cut investment packages to the minimum to keep borrowing down, just as they did with BR, even when the higher cost solution would have led to much reduced ongoing operating costs. Lets hope we don't go back to single lead junctions and singling odd short bits of line like Moreton to Dorchester.
However a lot of this boils down to an argument over what is reasonably practicable which would occupy a 150 page thread of its own...
Bald Rick is right that the BR civil engineer could keep costs lower by losing costs in overheads. He could also call upon engineers of all disciplines who knew the area like the back of their hand (including the closed bits which the BR civil engineering department still maintained unless the trackbed was sold off - little was outside urban areas - I remember in my first days on the railway helping install a phone in the local ACE office and seeing a map on the wall with all the closed bits and anotations on the closed bits for tunnels/viaducts etc.)
Feasibility study would have been a couple of inter disciplinary meetings followed by the various departmental engineering reps spending a day or so doing a budgetary estimate and short report which the BR project manager would have packaged up in another day or two. In other words it could be done with a lot less work too because the knowledge was in house, athlough in recent years Network Rail has begun to taken more and more back in house. Closed lines are now owned by BR residuary or whatever they are now called and maintained by someone else.
I'm not sure deterioration of structures over the last 25 years would have made that much difference as the main structure, the bridge over the Ouse had already gone (and was I think the excuse for closing the line -the real reason was I am led to believe that East Sussex council didn't want to fork out for a bridge on their new Lewes relief road (Phoenix Causeway), just as they don't much want the cost of forking out for a Bridge on the Uckfield Bypass now. I'm told - I was too young myself - that the road was built up to either side of the viaduct while they waited for the line to close so the viaduct could be flattened - but that might be an urban myth).
BR also owned the rolling stock and therefore often had a spare unit or two they could store long term without paying leasing charges, so finding an extra Thumper to extend the service to Lewes would not have been difficult. Similarly if they wanted a weekend possession they just booked it at the cost of the Area Manager getting cross rather than £thousands in compensation to a TOC.
I think it will happen eventually (a change in party running the county might help), the Lewes loop idea makes direct trains to Brighton feasible, but the BML2 lot seem to be living on another planet so long as they advance crackpot ideas like ripping up Tramlink and running via Elmers End, these seem to come out of the same magic cookie jar as the short lived attempt for a preserved railway at Addiscombe where someone advocated running an Addiscombe to Heathrow Airport service via some heath robinson route.
Personally I think a new alignment turning off at Isfield and dropping down to a Brighton facing junction at Glynde with an intermediate station at Ringmer would be a better solution but probably cost too much. In the meanwhile please someone get on and electrify it.
Last edited: