HSTEd
Veteran Member
- Joined
- 14 Jul 2011
- Messages
- 20,368
If a 315 is worse than a railbus..... great
We can scrap this whole scheme and things can carry on as they are.
We can scrap this whole scheme and things can carry on as they are.
If a 315 is worse than a railbus..... great
We can scrap this whole scheme and things can carry on as they are.
You are teasing. Even without refurb and a toilet a 315 is a much better experience than a Pacer. Ask any victim of Pacer commuting.
You are teasing. Even without refurb and a toilet a 315 is a much better experience than a Pacer. Ask any victim of Pacer commuting.
I agree, but the public particularly daily commuting public is more savvy than you or politicians think. An old train is instantly recognisable despite refurbs.
Don't try and disguise it. Just be honest and tell them these trains are all that can be afforded with installation of overheads. They will go with it just to replace Pacers.
I bolded the question in my last reply. I note your suddenly adding newly built. That wasn't part of the question that Bald Rich posted. Simply changing the question asked doesn't make the point your trying to force on the thread relevant (north vs London).
See post #60![]()
What exactly makes a train 'new' in the minds of Jane/Joe Public? 'New' trains have nice features like PIS systems (so you couldn't keep the manual destination blinds, and would need to fit something inside), WiFi, power sockets, modern seating and are generally cleaner and less worn on the inside than the Pacers or other old stock. J Public doesn't care that the traction package is obsolete (so long as it doesn't spontaneously combust, a la the 442s) or where they've come from, especially when you compare them against what they've got at the moment. If you really wanted to push the boat out you could fit air conditioning modules on the roof and replace all the windows with fixed panes. At that point the only definitively old feature about them from a passenger perspective, compared to the Thameslink 700s, is that they don't have the full-width internal gangways that are now not uncommon on brand new commuter stock. If you asked the people of Merseyside whether they're happy with their heavily upgraded 508s I think you'll find they are perfectly happy with them, and they would prefer to keep them rather than replace them with a smaller fleet of replacements. Most of the moping about the Northern 319s is that because of DfT incompetence they will enter service in an unrefurbished state, rather than intrinsic faults with the idea of them getting the 319s.
I have no such views.
I well remember the DfT around 1990 defending the £1billion spend on the Channel Tunnel routes (it was the saintly Portillo or his boss Parky) which had stripped the investment for the rest of BR bare for a couple of years.
This was for Eurostars, Waterloo, North Pole and the route upgrades including the WLL and Redhill-Tonbridge electrification.
Their view was "it's all spend on the UK railway".
You can't just "forget" that spend in the South East, or the later spend on HS1 and its new trains.
Mr Rick raised his question with aand my reply was in similar vein.
![]()
I travelled from Moorgate yesterday on a 313 to Drayton park and as a welshman who has travelled the Cardiff Valley lines network I can say these 313/315's are far better than a pacer.
The class 313 I was on is that it required a major deep clean and perhaps new seat covers and flooring etc to make it look more modern and cleaner
I travelled from Moorgate yesterday on a 313 to Drayton park and as a welshman who has travelled the Cardiff Valley lines network I can say these 313/315's are far better than a pacer.
The class 313 I was on is that it required a major deep clean and perhaps new seat covers and flooring etc to make it look more modern and cleaner
What about wires and refurbed / retractioned trains with aircon and wifi?
Well you might get that on a 319 but I very much doubt you will get that level of refurbishment on a 313/315 and if you do you probably end up keeping them until they are 60 years old!
Age isn't necessarily a problem. The Island Line trains date from 1938 but keep going because they are well maintained. Whether or not Canton will do this is another matter.47802 said:Well you might get that on a 319 but I very much doubt you will get that level of refurbishment on a 313/315 and if you do you probably end up keeping them until they are 60 years old!
Age isn't necessarily a problem. The Island Line trains date from 1938 but keep going because they are well maintained. Whether or not Canton will do this is another matter.![]()
Would you rather have one modern carriage or two or even three Cl31x carriages?
That is pretty much the choice.
Also pretty sure the PEP units still have better reliability than a bunch of diesel units.
Seems to me that the HR focus is wrong...
Core valleys is compact network with stations ~1.5 miles apart on average (on Rhondda branches <1 mile)
Network could be completely separated from HR in central Cardiff with minimal on-street sections
Electrification costs would be lower for 750/1500 DC LR vs 25Kv HR
On current network you could run more trams than HR (different ORR standards and Line of sight signalling as in Manchester)
Higher frequencies will drive higher demand and so revenue
Typical 3 car arctic tram can hold 250 people
OPcosts are lower (HR, maintenance, etc) for LR Vs HR
LR network more easily extended
Conversion to LR may have higher conversion capital cost but can run with much lower day to day operational subsidy or even 0 subsidy as in Manchester.
Likely to be better value over the longer term ,,,, and you get more for your money??
Anyone?
Slightly off topic, but many of the coaches involved in the derailment near Tiefencastel in Switzerland were 30-40 years old, judging by the photographs I've seen, yet still look modern, and feel modern to travel on. Even the RABDe 12/12 EMUs (built in the late 1960s, all withdrawn by 2008) were serviceable after a heavy refurbishment in the mid 1990s.
Cascading older units for newly-electrified lines isn't without precedent - when the West Yorkshire electrification project was completed in 1994 304s were cascaded to operate services there. Whether WAG will fund the purchase of new EMUs is a moot point.
Getting the wires up (and doing re-signallling/track layout alterations) first as one project, and then running services with existing rolling stock is historically normal practice.
...
Looking at OpenStreetMap it appears a suitable first candidate for light rail conversion would be the Coryton and Cardiff Bay lines. With minimal expenditure it would be possible to run these as tram-train lines, using the 25kV AC between Queen Street and Heath and running on 750V DC for street running sections around the Bay. Extra stations between Queen Street and Heath would be very useful as the area isn't well-served by rail.
I can think of a fair few historical counter-examples: e.g. King's Cross suburban (late 70s) had the 312s and 313s new, St Pancras-Bedford the 317s new, and further back, Kent Coast in the early 60s 4-CEP/4-BEP new, ditto London-Tilbury-Southend, and much of the inner GE electrification from Liverpool St.
All of which is a long way from S Wales.
Problem with that is that tram-trains will have to have drastically increased frequencies to supply anything like the same capacity.
Which will run you into problems that will likely prevent any additional stations on 'core sections' very rapidly.
This is the advantage of 80m trains compared to 33m ones.
You will also put your crewing costs through the roof.