hock: Is this a serious post? Both stations in Wakefield have been crying out for improvement for decades, the main reason it's taken so long to do it is a lack of funds, so I'm not sure how you'd manage to achieve such a radical change and have anything left to fund the services. It'd surely cost more to do that than what has been done and is currently planned. Re-routing ECML and XC services through Kirkgate would extend journey times to Leeds, and good luck flattening it for the rebuild, as the main building is Grade-2 listed: another reason it took so long to even get to where we are now.
Besides, what you've described with regard to switching longer distance services to Kirkgate is just reversing the decision taken in the 1960s and 1970s. One reason that didn't work was that neither station is big enough nor ideally situated for all the routes serving Wakefield, and making either one suitable would require massive investment in new junctions and connecting curves.
Really serious. Although could have been better expressed-at Kirkgate keep the fancy frontage but change everything behind. You mention lack of funds-I'm not surprised as there cant be any return.
You mention the 1960/70s. At that time the line through Kirkgate was heavily used by freight, predominantly coal. Now most of thats been lost so the issues re congestion/crossing paths arent so serious. However the trackworks nearly all still there, so I believe you could get 4 through platforms in, and possibly additional bays.
Even with the money spent on the 2 stations you still have fundamental problems
Poor connections from the South to Huddersfield and Halifax etc. partly due to the time to run between the stations and reverse.
Inability to run the Pontefract/Knottingley trains to Westgate meaning no connections for them
Similar inability to connect Castleford/Normanton
Operational shambles at Westgate due to lack of platform capacity
Passenger confusion e.g. which station to go to for Leeds or Sheffield
By concentration you would
Get better value from the booking staff with clearly a big improvement for present Kirkgate users
Similarly the other facilities such as catering/retail/taxi
I accept youd have to electrify down from Hare Park, and this could add a couple of minutes or so to journey times-but how many times do you arrive at Westgate and the train stand outside the station waiting for a platform? And diesels would have a choice of route into Leeds.
If you want to save money shut the line from Hare Park to Westgate over the viaduct. Replace Sandal with Agbrigg.
Clearly none of this will happen now, but it would have been a better use of money