It's being reported this morning that Grand Central's contract to run the Bradford / Sunderland - London services has been extended until 2026. And it seems that GC are now confident enough to consider what they are calling a "significant" investment in its rolling stock, as well as other passenger facilities.

http://www.thetelegraphandargus.co....al__39_s_London_to_Bradford_service_extended/

Chris Young said:
Grand Central's London to Bradford service extended

GRAND Central Rail has been awarded the contract to run trains between London and Bradford for another decade.

An extended ten-year contract has been agreed by the Office of Rail Regulation following a 28-day consultation last year.

It will allow Grand Central Rail to continue operating services between London King’s Cross and Sunderland and London King’s Cross and Bradford until 2026....
This is at least good news for Bradford & Sunderland who can now keep their semi-regular connection to the capital, and I wonder if it also bodes well for other towns & like Huddersfield for whom new services are proposed? It certainly seems that GC & open access services are here to stay for the medium term at the very least.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Haydn1971

Established Member
Joined
11 Dec 2012
Messages
2,101
Location
Sheffield
What's the condition of the Grand Central HST's like ? Could they do with a refurb or replacement ?
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,351
Location
Yorkshire
Though I heard a while back that GC were hoping to replace the HSTs with more 180s at the earliest opportunity. When that might be, however, is another matter. The 180s could probably do with a thorough refurbishment internally though. The faded FirstGroup seat covers really let them down.
 

Moonshot

Established Member
Joined
10 Nov 2013
Messages
3,806
Excellent news, its a great service and long may it prosper.
 

Stats

Member
Joined
27 Sep 2009
Messages
943
GC are looking to have a uniform stock which was envisaged to be 180s at the time of the application
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,093
Location
Redcar
What's the condition of the Grand Central HST's like ? Could they do with a refurb or replacement ?

Though I heard a while back that GC were hoping to replace the HSTs with more 180s at the earliest opportunity. When that might be, however, is another matter. The 180s could probably do with a thorough refurbishment internally though. The faded FirstGroup seat covers really let them down.

The last I heard was that GC were eyeing up Hull Train's 180s as they appear to be some of the best both in terms of mechanical reliability and also interior condition. All being well the four HT 180s should be available by around 2016.

Certainly I would be surprised if GC opted for anything other than more 180s as the advantages of operating one type of train for such a smaller operator must surely be significant.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
The last I heard was that GC were eyeing up Hull Train's 180s as they appear to be some of the best both in terms of mechanical reliability and also interior condition. All being well the four HT 180s should be available by around 2016.

Certainly I would be surprised if GC opted for anything other than more 180s as the advantages of operating one type of train for such a smaller operator must surely be significant.

What will happen to Hull Trains?

I much prefer the HST ;)
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,093
Location
Redcar
What will happen to Hull Trains?

Well hopefully by then (2016ish) the route to Hull will be wired and HT will be operating a shiny fleet of EMUs (another rumor has it they're looking seriously at IEP). Obviously if that falls through then they won't be available and GC will have to look elsewhere but it's looking pretty much like a nailed on certainty now.

I much prefer the HST

Well yes but this is the modern and thrusting railway so there's no room for that 1970s rubbish *runs and hides* ;)
 

thedbdiboy

Established Member
Joined
10 Sep 2011
Messages
1,210
The terminology in the original article is misleading - Grand Central are not a franchise. However, as an Open Access Operator to the rail network, they do require a track access contract with Network Rail, which is conditional on holding a suitable license to operate trains from the ORR. It would appear that it is the latter that has been extended for a further ten years.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
Well hopefully by then (2016ish) the route to Hull will be wired and HT will be operating a shiny fleet of EMUs (another rumor has it they're looking seriously at IEP). Obviously if that falls through then they won't be available and GC will have to look elsewhere but it's looking pretty much like a nailed on certainty now.

Well yes but this is the modern and thrusting railway so there's no room for that 1970s rubbish *runs and hides* ;)

The timescales seem tight. Is 18 months enougth to plan, resource, fund and instal the wires and procure the trains? I assume they will go over to IEP if the line goes electric.

I am all for new stuff - just make it nicer to ride in than the old stuff ;)
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,093
Location
Redcar
The timescales seem tight. Is 18 months enougth to plan, resource, fund and instal the wires and procure the trains? I assume they will go over to IEP if the line goes electric.

I'm not going to disagree with you but that's the plan. In terms of funding it's already in place (and it's mostly local funding) the only hold up was getting the DfT to agree/fund GRIP stage 3 (option selection) and that happened back in March I believe. So unless that throws up something really unexpected it should happen it's just a question of if they can make it happen in the aggressive timescale that's been set.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,270
As well as the ex Hull Trains 180s aren't the 5 FGW units becoming available as well, at least in similar timescales. FGW's 180s could well be replaced indirectly by EMUs that already exist (releasing Turbos onto the Cotswold routes), whereas the HT sets need new 125 stock to be found.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,332
Location
Yorks
Definately good news.

GC has often gotten me out of a spot when the fare offerings of incumbent operators have been decidedly uninspiring.

Sad about the HST's though.
 

SeanG

Established Member
Joined
4 May 2013
Messages
1,377
GC HSTs have some of the best interiors around.
Conversely, the one GC 180 I have been on had the worst
 