HSTEd
Veteran Member
- Joined
- 14 Jul 2011
- Messages
- 20,395
So while I am often advocating 400m long double deck trains, I also advocate constructing a skeleton of Shinkansen esque new railways around the HS2 spine.
The 'local' services on these lines, at least in the beginning, will certainly not require 1352 passenger trainsets, so I maintain an active observance of various places to determine what the shortest trainsets available are in the marketplace.
For a long time this has been the AGV-7 at 133m.
I have now discovered the CAF OARIS - which is available in 4 car formations - these have a length of approximately 103m.
While it only has 50% of axles motored, hardly perfect for Shinkansen operation it has buckets and buckets of power, I put it at 5280kW for the 4-car formation - which is plain silly.
So in essence, my shinkansen operation can get away with stations in small towns since it won't have to use big trains
This might become especially important as the high speed network expands - and thought some people might be interested as the minimum length of trains gets ever smaller.
The 'local' services on these lines, at least in the beginning, will certainly not require 1352 passenger trainsets, so I maintain an active observance of various places to determine what the shortest trainsets available are in the marketplace.
For a long time this has been the AGV-7 at 133m.
I have now discovered the CAF OARIS - which is available in 4 car formations - these have a length of approximately 103m.
While it only has 50% of axles motored, hardly perfect for Shinkansen operation it has buckets and buckets of power, I put it at 5280kW for the 4-car formation - which is plain silly.
So in essence, my shinkansen operation can get away with stations in small towns since it won't have to use big trains
This might become especially important as the high speed network expands - and thought some people might be interested as the minimum length of trains gets ever smaller.