I have been travelling quite a lot between Nuneaton and Glasgow over the last few weeks and it occurred to me that despite the faster journey times now using Pendo's there is a lot of scope for further improvements if slow sections like Colwich, Stafford, Norton Bridge, Crewe and Carstairs were sorted. However, can anyone confirm why the go ahead was never given for the Pendos to operate at 140mph? I think I remember something about 'in cab signalling' needed? Surely it would be much cheaper to implement that and sort out the slow sections than HS2 and still reduce journey times quite a lot? Or am I missing something?
As I understand it the rules (set by RSSB for the industry) require in-cab signalling for speeds over 125mph.
That was planned for the WCML south of Crewe for 140mph Pendolinos, but Railtrack found the technology didn't exist c2000.
Pendolinos in fact use in-cab signalling over 110mph anyway to control tilt (TASS), in addition to the fixed signals.
Supposedly ERTMS (ETCS on trains) will deliver cab signalling, starting on the GW main line and then the ECML south of Doncaster, by about 2020.
So IEPs may well be able to run at 140mph with it.
But RSSB/NR and the TOCs haven't developed the rules for 125mph+ working. That's the stumbling block for any higher speed operation.
Virgin still want higher speeds, maybe 135mph, and were looking at the new Trent Valley section, and another stretch near Lockerbie.
The remaining slow sections of the WCML are not likely to change, except for Stafford-Norton Bridge where an upgrade to 125mph has begun (flyover towards Stoke, eliminating Norton Bridge Junction).
Carstairs is being looked at again I think, particularly regarding speeds towards Edinburgh.
The slowest sections now are the 20mph environs of Preston and Carlisle which weren't touched by any of the WCRM upgrade work.
Crewe (80mph) might well get remodelled for 125mph in the HS2 work - though stopping the Liverpools there doesn't help the case.
Colwich (90) isn't likely to change, and Warrington-Wigan (80-110) is still stuck in the 1970s, without tilt being fitted.
Atherstone is still quite restricted (75/85EPS).
Edit: I forgot the final crawls from Law Jn into Glasgow, and Midcalder into Edinburgh - both very poor line speeds and unchanged for years.
Meanwhile, there's a view that higher top speeds would actually reduce capacity on a mixed-speed railway.
140mph Pendos around Lockerbie would have to coexist with 110mph class 350s and 60/75mph freights.
Not so troublesome on the 4-track Trent Valley.