Is the dilapidated pub next to the station going to be pulled down? Not the greatest view once you leave the station.
I'm so pleased that this building is being renovated. I hope serious consideration has been given to installing a fully staffed ticket office. The station would feel safer with one for a start.
I'm so pleased that this building is being renovated. I hope serious consideration has been given to installing a fully staffed ticket office. The station would feel safer with one for a start.
It is planned to I believe, however as part of some community-led scheme, so not your traditional booking office that you'd find at places like Wakefield Westgate, Leeds etc.
I think its listed, saying that though even I'd want to tear it down and replace it with a bus stop.
I'd rather it was refurbished and turned into a good independent pub. Every station should have one![]()
Rejoining the HUD-Wakey to the HUD-MCV stopper is a non-starter in the short to medium term for a number of reasons... Firstly, the Colne Valley nodding donkey is set to be replaced by TPE semi-fasts soon. Secondly, I'm not sure how merging them would free up P4 at HUD anyway, as the Wakefield generally uses P5, which is too short for either of the Leeds stoppers much of the time.
Back on topic, it's great to see Kirkgate finally getting sorted out and re-staffed, though think how much easier it would be if it hadn't been allowed to fall into such disrepair in the first place!
Looking at the two stations, it doesn't look as if one is more (or less) convenient than the other. I also thought a free bus tours around.
Is that correct?
Not sure why there isn't a Wakefield Manchester service, with the redevelopment of Westgate there is space for a bay platform to accommodate a new Manchester service, as well as the Huddersfield service instead of of moving up into the sidings, obviously providing the pathways could be found on the Calder Valley route. This would give Brighouse and the proposed Elland station an extra Manchester service an hour, as well as Hebden Bridge an extra service in each direction.
Not sure why there isn't a Wakefield Manchester service, with the redevelopment of Westgate there is space for a bay platform to accommodate a new Manchester service, as well as the Huddersfield service instead of of moving up into the sidings, obviously providing the pathways could be found on the Calder Valley route. This would give Brighouse and the proposed Elland station an extra Manchester service an hour, as well as Hebden Bridge an extra service in each direction.
Up until the 1970's,there were through services from York to Manchester Victoria, via Wakefield Kirkgate and the Calder Valley line.
It would be good to see these restored, thus not only giving Wakefield a through service to Manchester, but also to Castleford & York too.
With the new building at Westgate it certainly would be easier to provide a bay, though I'm not sure it would be that easy. The Doncaster end of the platforms span the bridge over Westgate, meaning the existing platforms would need extending to the North to allow them to be cut back to make space for pointwork to the bay(s)... Do-able, but not cheap! Additionally Wakefield council and Metro want a bay to allow the Kirkgate to Knottingley service to extend to Westgate. I imagine that would take priority over a new Manchester service.
..
But surely they will soon have to extend the platforms northwards anyway, so that I don't have to walk so far to the first class carriages. At the moment it is practically a taxi ride away from the station building
IMO rather than an UP side bay, the DOWN side at Westgate needs drastic rebuilding. The through road is little used and could become a reversible platform road on the east side of an island platform with a new DOWN main platform on it's outer, western face. It would require shifting everything to the north but there is space. The reversible centre road could then also form a badly needed extra passing loop to allow EC & XC trains to pass locals in the event of late running. At the moment there is no loop for passenger trains north of Hemsworth and late running is endemic causing very poor performance on the Sheffield/Doncaster-Leeds locals as well as long distance trains. EC try to get round the problem by allowing a lot of recovery time for arrival at Leeds.
This would be expensive and since this is the North of England it will never happen.
Back to Kirkgate, I am surprised that the scheme did not include replacing the rather wet subway with a footbridge. Admittedly the subway is brighter and better lit now, and presumably complies with accessibility legislation as it has ramps, but the constant ingress of water will cause it to deteriorate again before long.
I wish they would provide proper canopies on the island platform as this is where most passengers have to wait for trains to Barnsley, Sheffield, Nottingham, Pontefract & London. As it is, it is rather bleak, rain and wind swept and gives the station an asymmetrical appearance.