Does anyone know anything about when the Severn Tunnel is going to be wired (or even whether they will use wires) as part of the Great Western project?

I'd imagine its not until after the Golden Valley redoubling, but there has been very little news on that of late either. It seems strange that there has been so little work done on what must be one of the most complicated elements of the whole project - that of refurbishing the 7km tunnel.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Flamingo

Established Member
Joined
26 Apr 2010
Messages
6,806
I know that the planning is already taking place. The last thing you should see is boots on the ground, and I think that will be some time off.

The more time they spend planning, the less chance of a serious cock-up when it happens. Don't forget the six P's!
 

joeykins82

Member
Joined
24 Jul 2012
Messages
601
Location
London
Peter Dearman said:
As for the tunnels – the big one I guess you’re interested in on GW is the Severn which in fact is really quite an electrification-friendly tunnel with quite good clearances. From the initial survey work we’ve done already, we’ve found that the room in the roof of the tunnel is capable of accommodating normal low encumbrance equipment like we put in tunnels elsewhere in the UK. And it would also be perfectly appropriate to use solid beam technology through the tunnel. We will consider both options when we move into the detail design phase.
Full article: http://www.globalrailnews.com/2011/04/28/electrification-delivering-the-transformation/
Found via: http://en.wikipedia.org/wiki/21st-century_modernisation_of_the_Great_Western_Main_Line

As far as timetable goes, electrification to Bristol is due in 2016 and Cardiff in 2017, so the Severn Tunnel will be presumably be a 2016/2017 job.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,938
Location
Mold, Clwyd
As far as timetable goes, electrification to Bristol is due in 2016 and Cardiff in 2017, so the Severn Tunnel will be presumably be a 2016/2017 job.

That document is 3 years old.
I have read somewhere that the Severn Tunnel wiring is proving more difficult and costly than originally thought.
There are also still the issues of how the wiring will be done in South Wales, including whether to include the slow (sorry, relief) lines between Severn Tunnel Jn and Cardiff.

I imagine diversions via Gloucester will start when the Wootton Bassett-Bristol Parkway route is being wired, which ought to be next year.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,651
Location
Hampshire
That document is 3 years old.
I have read somewhere that the Severn Tunnel wiring is proving more difficult and costly than originally thought.
There are also still the issues of how the wiring will be done in South Wales, including whether to include the slow (sorry, relief) lines between Severn Tunnel Jn and Cardiff.

I imagine diversions via Gloucester will start when the Wootton Bassett-Bristol Parkway route is being wired, which ought to be next year.

Do we know if NR were still considering installing OHLE via the the overhead rail system for the Severn Tunnel (ala Edinburgh's Mound Tunnels and the Thameslink Core) than overhead wires or has that yet to be decided?
 

ic250

Member
Joined
3 Apr 2014
Messages
60
There are also still the issues of how the wiring will be done in South Wales, including whether to include the slow (sorry, relief) lines between Severn Tunnel Jn and Cardiff.
.

I can't see the thinking behind not covering the slow lines as well as part of the electrification project. Can all the intercity and local services use the fast lines?

If that's the case it seems that NR are cutting some serious corners on this job.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,938
Location
Mold, Clwyd
I can't see the thinking behind not covering the slow lines as well as part of the electrification project. Can all the intercity and local services use the fast lines?
If that's the case it seems that NR are cutting some serious corners on this job.

Cost. They have to resolve the overspend (scope creep and roll-out costs).
Nobody wants other CP5 electrification projects cut because of GW overrun.

My perception is that the slow lines are not much used by passenger trains, certainly not STJ-Newport.
On the other hand wiring for freight is important, and is one of the strategic reasons behind the "electric spine".
 

Michael.Y

Established Member
Joined
14 Oct 2011
Messages
1,437
Cost. They have to resolve the overspend (scope creep and roll-out costs).
Nobody wants other CP5 electrification projects cut because of GW overrun.

My perception is that the slow lines are not much used by passenger trains, certainly not STJ-Newport.
On the other hand wiring for freight is important, and is one of the strategic reasons behind the "electric spine".

Still handy to have as an emergency backup mind. No reason to wire relief in Thames Valley and not relief in South Wales. Relief between NWP and CDF will have to be wired, so may as well do small part to STJ.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,361
They could always wire the reliefs with trolley and accept a low-ish speed limit on it for electric traction.
(Differential 'E'?)
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Its fascinating to see them raise the grille and see there is basically a river running under the Severn tunnel.
 

BestWestern

Established Member
Joined
6 Feb 2011
Messages
6,736
Michael.Y:1865102 said:
Still handy to have as an emergency backup mind. No reason to wire relief in Thames Valley and not relief in South Wales. Relief between NWP and CDF will have to be wired, so may as well do small part to STJ.

I agree it should be done, but surely there is no parallel with the Thames Valley - the reliefs there will be used by the electric stock on local services, which won't be the case in South Wales - unless I'm missing something?
 

joeykins82

Member
Joined
24 Jul 2012
Messages
601
Location
London
I guess that's the crux of the argument. The Welsh Assembly will be saying that the relief lines should be wired with the mains because the intercity electric trains will use them during main line track possessions and other times of disruption. The Department for Transport will be saying that the GWML electrification only covers the main lines, and that the relief lines which will be used by local services should be paid for out of the valley lines electrification budget.
 

HSTfan!!!

Established Member
Joined
11 Jun 2005
Messages
1,975
They could always wire the reliefs with trolley and accept a low-ish speed limit on it for electric traction.
(Differential 'E'?)

The reliefs are only 40mph between STJ and NWP with an increase to 60 after AD junction anyway.
 

DaveHarries

Established Member
Joined
12 Dec 2011
Messages
2,576
Location
England
It was reported not too long ago - I can't recall where - that the line east of Bath Spa is going to be closed at some point next summer for a few days for works in connection with the electrification.

Meanwhile, where is the "Golden Valley"?

Dave
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,938
Location
Mold, Clwyd
Meanwhile, where is the "Golden Valley"?
Dave

It's the posh name for the Stroud or Chalford valley, leading up to Sapperton tunnel, Kemble and Swindon.
Shorthand for "Swindon to Gloucester Line".

Just to confuse, there's another Golden Valley, in Herefordshire, and it also had a railway (Pontrilas to Hay on Wye) which closed in the 1950s.
 

ic250

Member
Joined
3 Apr 2014
Messages
60
The reliefs are only 40mph between STJ and NWP with an increase to 60 after AD junction anyway.

And the maximum on the fast lines is only 90mph from Severn Tunnel Junction to Cardiff (and lower thereafter), IIRC.

Presumably linespeeds will increase after the current resignalling work is complete?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,726
Newport area got resignalled a few years back in stages, nothing will touch that now until ERTMS comes along.
 

HSTfan!!!

Established Member
Joined
11 Jun 2005
Messages
1,975
And the maximum on the fast lines is only 90mph from Severn Tunnel Junction to Cardiff (and lower thereafter), IIRC.

Presumably linespeeds will increase after the current resignalling work is complete?

I wish, it's a bit painful running so far at 40 lol
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,361
You could put cheapo trolleywire up and still run at 50.
Better than a 75mph diesel line or anything like that.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
It's the posh name for the Stroud or Chalford valley, leading up to Sapperton tunnel, Kemble and Swindon.
Shorthand for "Swindon to Gloucester Line".

Just to confuse, there's another Golden Valley, in Herefordshire, and it also had a railway (Pontrilas to Hay on Wye) which closed in the 1950s.

There are several Golden Valleys. Try typing "Golden Valley" into a mapping site like www.streetmap.co.uk. It appears to find 12 (including a Golden Valley Plantation). Some of those may be repeats but to judge from the counties there must be several genuinely different.
 

Michael.Y

Established Member
Joined
14 Oct 2011
Messages
1,437
I agree it should be done, but surely there is no parallel with the Thames Valley - the reliefs there will be used by the electric stock on local services, which won't be the case in South Wales - unless I'm missing something?

It would just make more sense to have the option available. No good having shiny new electric ICX trains if they're stuck at NWP while all those dirty old diesel units go chugging past. Plus it would allow more flexibility with regards to empty stock moves, rugby matchday shuttles etc.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,893
Location
South Wales
Dont forget the Welsh government/SEWTA have proposed these local services between Cardiff and Abergavenny etc as well as extra services to Chepstow etc so some of these most likely will have to use the relief lines especially if they serve the long proposed station at St Mellons etc.

Some freights could potentially be hauled by electric traction if the full route the service runs on is electrified
 