Quite happy about Hatfield being a station staffed from first to last trains, as well as the general progress of the station upgrade happening now. And if Oyster is extended at last, that's awesome. No more faffing with paper tickets ever again!
Apart from a single stub about "southeastern joint services included" there is little else except for:
"the existing complex Thameslink pattern will be replaced by
a regular all-day pattern of 2tph to/from Sevenoaks (all day,
via the Catford Loop) and 2tph to/from Maidstone East (in
the peaks and limited off-peak hours, with a more limited
calling pattern);"
"First to last station staffing will be introduced at Denmark Hill,
Elephant and Castle, Loughborough Junction and Nunhead
as part of plans to provide first to last staffing at the 101
busiest stations on the GTR franchise."
So very nearly nothing (or simply nothing) changes to how it is today.
Quite happy about Hatfield being a station staffed from first to last trains, as well as the general progress of the station upgrade happening now. And if Oyster is extended at last, that's awesome. No more faffing with paper tickets ever again!
It's hard to view it as an improvement when - running on purely metrics alone - a 0% increase in train length or frequency is nowhere near to being an improvement.

It's good to see we'll have 2tph from Hertford to Stevenage from May next year.
I'm also very pleased with the extra staff that'll be coming in at stations shortly. I know some people don't like barriers, but it means gateline staff at Hornsey, Alexandra Palace and others. The staff presence is great news for passengers.
Where did it say that regards 2tph on Stevenage to Hertford?
377's for the trains to Kings Lynn... where are these ones coming from now? 377/5s?
377's for the trains to Kings Lynn... where are these ones coming from now? 377/5s?
Aiming to extend Oyster Pay As You Go (PAYG), in partnership with TfL and other TOCs, as far as Epsom, Gatwick Airport, Luton Airport, Welwyn Garden City and Hertford North, covering all our Metro services and thetwo major London airports
More on Oyster PAYG extensions.
Quote:
Aiming to extend Oyster Pay As You Go (PAYG), in partnership with TfL and other TOCs, as far as Epsom, Gatwick Airport, Luton Airport, Welwyn Garden City and Hertford North, covering all our Metro services and the two major London airports
What does Brighton mainline re-casting mean?![]()
With the reduced competition, the new timetable will see 3tpd from London to Brighton, using Pacers.
It's mentioned in the PDF posted above, specific to the GN.
With the reduced competition, the new timetable will see 3tpd from London to Brighton, using Pacers.
I didn't see any mention other then from December 2015 that Inner Suburban services via Hertford North will start/terminate at Stevenage instead of Letchworth :/
It will be interesting to see whether the extension of Oyster PAYG to Epsom will require the installation of a interchange reader at Raynes Park or Surbiton for a cheaper fare not leaving the London zones.
It's on the second page. In the same point about HFN trains going to 4tph off peak.
A cheaper fare between where?
Oh yes, so it is. Oops.
The last time Oyster was looked at as a payment type on Thameslink/GN Hertfordshire stations, wasn't it Herts Council that turned it down? Or is my mind playing tricks?