Err The hope valley line is no where near its potential capacity.
The last time I looked it was a 70 mph line with semaphore signalling and 2 car dmus.
There are much more beneficial lines that should be opened up before the Woodhead line is considered, such as the East West Rail link from Cambridge to Oxford which would create a real outer london orbital line for Freight to relieve conjestion to the GEML and the NLL, or the sadly now gone chance of the Cambridge - St Ives - Huntington line
I dont really see capacity problems at Stockport are a problem as there are alternative routes in to Manchester.It's at Dore tunnel and Stockport there is problems, but more coaches should be added yes.
Err The hope valley line is no where near its potential capacity.
The last time I looked it was a 70 mph line with semaphore signalling and 2 car dmus.
Err The hope valley line is no where near its potential capacity.
The last time I looked it was a 70 mph line with semaphore signalling and 2 car dmus.
Could they not install IB as on the S&C
There are serious capacity shortages on the Hope Valley route. Plenty of freight uses the route both night and day, mostly to and from the Peak Forest/Buxton areas, and also in and out of Earles. Passenger services operated by Northern, TPE and EMT also regularly catch up with each other causing delays.
The Woodhead route should never have been closed in the first place, it was a very short sighted move, however i think the possibility of reopening it is zilch, seeing as a vast length of it is now a cyclepath/footpath (the lycra clad cycle nazi's would squeem and squeem and squeem!) and there are far more pressing areas where money needs to be spent, ie upgrading existing track, upgrading stock and electrifying the MML.
In a tunnel? Not allowed under group standards I believe. Section is controlled by Sheffield PSB, fringing with Grindleford SB worked under TCB far as I know.
Woodhead could be re-opened for £160 million, which compares to the cost of widening between one set of junctions on the M1 and we could divert a good deal of freight over there, and provide new journey opportunities from North Sheffield and East Manchester. Hadfield - Sheffield in 15 minutes was mentioned. Several schemes have been proposed, two by private freight companies and at least one TOC.
The current scheme is private and requires no public money, just public support.
Regarding the exact timetable details, I have no idea as it doesn't specify them. They ought to include passenger trains as it would help the case.
As for costs, and most things I quote on this forum, I am repeating facts I have gathered from credible sources. Some people seem to think there is no case for things but they need to back that up with credible sources to, else this forum comes across like a bunch of negative so and sos or just out to shoot the messenger.
It's in the proposal, which is was compiled by consultants
Faber Maunsell and MDS Transmodal.
The £169m costing includes staff, stock the lot. The cost of re-opening to route is £109 million.
Don't forget it's still pretty much intact, and modern track laying machines can get track down that the rate of 1-2km per day.
http://www.translinkuk.com/proposal/Translink Proposal Feb 06 - Original.pdf
http://www.waverleyrailwayproject.co.uk/qanda.php
35 miles for £174m (half single track, half double) or a route closed in 1969 (only 13 years prior to Woodhead)
Also, what about the cost of moving and rerouting all the high voltage electricity cables and gas / water pipes which were laid through woodhead tunnels. the railway will have to CPO and then pay national Grid to remove and re-route them. Should they choose to use pylons, this will lead to a public enquiry etc....and cost and delay
Correct, but there is an application to move them into the new tunnels - which must be objeted to, as that would kill off any chance of re-opening.I thought the cables ran through the old tunnels, rather than (currently) the new one?
http://www.waverleyrailwayproject.co.uk/qanda.php
35 miles for £174m (half single track, half double) or a route closed in 1969 (only 13 years prior to Woodhead)
I think consultants looked at the Peak line, and concluded it wasn't a goer - for now. As much as I'd like to see that open.
While it's true there is nothing in the middle on the Woodhead route (not withstanding suburbs) I would except there to be some agglomeration benefits of such a link between Sheffield and Manchester.'
Even if it didn't make a financial return on paper, it should be supported in relieving congestion and pollution through a national park, and the the positive externalities which new transport routes bring.
Well I suppose it depends what measure you call crackpot, personally I think some of the schemes in Scotland are far more crackpot, even Cross rail with it's £15 billion costs - mostly tunnelling - is bordering on that from a farebox point of view. But there are a lot of benefits connecting the city and West end to the West of London and Heathrow on a more direct service.
Even if it didn't make a financial return on paper, it should be supported in relieving congestion and pollution through a national park, and the the positive externalities which new transport routes bring.