61653 HTAFC
Veteran Member
I think I remember reading somewhere that the 3rd rail electrification south of Bournemouth was done on the cheap so that section of 3rd rail might have a shorter working life. Hopefully the overhead when installed on the spine will at least go as far south as Poole, would be nice if it went all the way to Weymouth.
Once the routes between Kent and London get converted to overhead it would also give Eurostar a few diversionary routes for emergencies
The 374s and any subsequent CTRL stock just wouldn't fit the gauge unless the NR routes were enlarged to GB+. In theory, the 373s could use them but I would imagine a plethora of commercial and legal obstacles would prevail.
If there was a regular need to divert Eurostar away from HS1, they'd have kept the shoegear on the 373s. Dedicated high-speed lines don't require long possessions to maintain them in the same way that the 'classic' network does.