T
There's also a mention of Blackrod up to 6 x 24m - dependant on what rolling stock is to be utilised on the Manchester-Bolton-Preston line post-electrification.
Salford Crescent has just been lengthened to 6 x 24m, so 6 car 185s are covered so I can't see Network Rail funding a further extension so soon afterwards.
That would seem to indicate that 6 x 20m is not beyond belief if most of the platforms have already been extended to support it and the rest seem soon to follow in any case.
Pacers are the worst of the DMUs for acceleration, but don't forget on lines being electrified there's a lot of 150s, 156s and 185s currently used.
As I understand it almost all Northern DMU services are timed for Pacers because the fleet is so stretched that they cannot guarantee what will turn up on any particular route on any particular day.
Massive delay payments taught them to assume the worst case on every route and just have the Sprinters pushed less hard to keep to time.
Don't forget that there will still be DMUs operating on the Bolton-Manchester and Manchester-Stockport lines post-electrification.
Yes, but those DMUs will be the faster accelerating Sprinters and not the slower Pacers. And CP6 could easily see a bunch of infill projects if there is a ready supply of 75mph EMUs and a shortage of 75mph DMUs (which appears to be the situation at the present time).
The idea is the number of additional electric carriages will significantly exceed the number of diesel carriages withdrawn. This means not only do the newly electrified lines get additional capacity but non-electrified routes get additional capacity through cascades.
There are 192 Class 313 carriages - that is a lot, it seems there would be no shortage of stock in the Manchester area (for example).
If the alternative is to scrap 190 useable vehicles or add that as capacity that seems to be a no brainer.
It was ATOC who declared no new DMUs would be required before 2024 - not never - but that was based on certain assumptions like the 150s remaining in service until at least 2024. If the 150s start failing left, right and centre they'll have to review that idea.
I was thinking more along the lines of the political connotations of ordering more 'dirty diesel' trains in the future.
The government is trying desperately to cling to 'green' credentials and ordering trains that require fuel purchased from the Russians is not going to look very good.
Better to force the railway to struggle on with existing diesels. So that is what will happen.
Also building dual-powered (diesel and electric) trains or electric trains that can do the last leg on a charged battery could be looked at. Network Rail have said such units would need to be built for regional routes which have a good business case for new rolling stock which could then result in units like 158s and 170s being cascaded down to rural routes which have a poor business case for new rolling stock or electrification.
Requires expensive bespoke new stock - if the recent past has shown us anything it is that the future is in knockoffs of a handful of designs - which at the present time appear to be the IEP, Electrostar and Desiro.
Network Rail is just terrified of being forced to electrify more stuff more quickly and would say anything to force the abandonment of the electrification programme.
(Wide deployment of dual powered units would kill the programme it appears since it removes the network effect from consideration).
Which implied diverting the service via Wigan to use the route that is now fully electrified rather than the route which will be fully electrified.
Sorry, that was my result of my not really understanding the railway network North-west of Manchester as well as I should.

I never really grasped their being more than one route out of Manchester to the North and the WCML.
Manchester-Blackpool via Bolton should be fully electric by 2016 so we'll need something which is available before 2018.
Just like we need something to work the Todmorden curve from opening?
Or we need electric trains to operate Hazel Grove services?
Just because the wires will be up and powered doesn't mean that electric trains will instantaneously appear to work them - if they were going to be available they almost certainly would have been ordered by now.
6 car EMU formations would be good for the North West but as some-one pointed out if the 313s are to survive beyond 2019 then they'll need significant work to remain in service which may not prove economically viable.
The only work they
need to remain in service is a shiny certificate signed by the Secretary of State for Transport exempting them from the requirements of the DDA.
Any other work they recieve would be justified on operational and marketing grounds.