It is difficult to see how it could be much improved given the PSRs at Bradley Wood and Greetland-Dryclough due to tight curvature.... Maybe, as well as access to Brighouse the main utility of this route is to open up connectional possibilities e.g. Bradford-Barnsley/Sheffield, Halifax-Man Picc (without using Metrolink) & MIA etc and so journey times are not so critical. Would there be some attraction if these trains ran through to Sheffield via Penistone as was the case until ~1965?
There was of course once a more direct route via Bailiff Bridge but I doubt it was either well used or much quicker.
Not only is there a severe PSR at Greetland Junction, but that is at the foot of a steep gradient up to Dryclough Junction. So, not having the advantage of a running start, this section of line has always been slow. In the days of steam it was commonplace for bankers to be used.
There used to be a service from Bradford Exchange to Penistone, which connected with the Woodhead electrics into Sheffield Victoria, giving a time of about 90 minutes from Bradford to Sheffield. Of course the direct route from Penistone into Sheffield Victoria is now lost, and I doubt the detour via Barnsley would give a very creditable time for any Bradford-Sheffield services.
The direct route between Bradford and Huddersfield via Bailiff Bridge [the Pickle Bridge line], was quicker than that via Cleackheaton or Halifax. I seem to remember reading times of about 30 minutes were possible, but unfortunately, I cannot now find the source of that information.
I think the main reason for the closure of this route [as early as 1948 to passenger traffic and totally in 1952] was not so much poor usage but the state of Wyke viaduct. Ironically, but for a difficult landowner refusing to allow the railway access to his land, the viaduct need never have been built in the first place. But it was built on poor ground and deteriorated so badly that fears for its safety increased, and by the time it was closed, a PSR of 5mph had been imposed.
Last edited: