• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Cambrian hourly service consultation

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Rail UK Forum members will be interested to learn the May meeting of the Shrewsbury/Aberyswyth Rail Passenger Association SARPA, will be held within Shrewsbury Railway Station on Tuesday May 6th. The meeting commences at 5.45PM, Anyone wishing to attend will be most welcome. Several guest speakers have indicated they will attend.



SARPA MEETING. SHREWSBURY. 6TH MAY 2014 Venue The Chester Room,Shrewsbury Station

AGENDA

Venue:- Shrewsbury Railway Station. Start time 17.45

1) Apologies for Absence.


2) a) Minutes of Meeting held @ Caersws, April 1st 2014
b) Matters Arising


3) Hourly Service Matters.
a) Timetable
b) Additional trains to work entire length of line?
c) Provision of Rolling Stock
d) Connections at Salop

4) Rail Development Officer


5) AOB

Interesting comment from Arriva on todays opening of Barmouth to Harlech
on BBC websites.


In my opinion any reduction is bund to increase passengers, a nice gesture.

Guest includes Mansel Williams Chair of Shrewsbury to Aber Line Lisison Commitee and member of Cambrian Rail Implementation Group. Msy get some insight on process of getting extra services and some detail not in public domain.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
Guest includes Mansel Williams Chair of Shrewsbury to Aber Line Lisison Commitee and member of Cambrian Rail Implementation Group. Msy get some insight on process of getting extra services and some detail not in public domain.

The guest may well have information that is not currently in the public domain,ATW may well be present?, good gesture having the meeting in Shrewsbury Stations Chester Room,I hope to attend.

Bob
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
3) Hourly Service Matters.
a) Timetable
b) Additional trains to work entire length of line?
c) Provision of Rolling Stock
d) Connections at Salop
If anyone here goes to the meeting, I'd be greatful if you could pass on any answers to those questions that are presented.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
This is not gospel.....but provides "answers" to some of the above questions.
They will be passed on.
Thanks both.

One overnights at Carmarthen and one at Cardiff Canton with a third S Wales diagram starting very early from Chester 0515 - you'll find the 3 will get everywhere on ATW Table 3 except Milford Haven.
Is a class 158 now the booked traction for daytime Fishguard boat train 7 days a week (and the evening Fishguard trial services on the 6 days they run)?
 

47421

Member
Joined
7 Feb 2012
Messages
686
Location
london
0640 Barmouth - Aber is a nice little train, when was the last time they had a direct service?
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
Went to the meeting yesterday,it was well attended in the Chester room at Shrewsbury station,I was an invited guest from the Shrewsbury/Chester line.

Interesting travel to Salop from Ruabon,saves congested Wrexham town roads in the late afternoon.caught the late running 1642 ex Ruabon,this train usually goes to Cardiff,but due to work in the Newport/Cardiff area,all Holyhead/Cardiffs stop/start at Shrewsbury due to pathing,a sensible move in my opinion ,as the Holyhead/Cardiff services attract far fewer passengers compared to the Manchester/South Wales runs.
The train was a two car 175,rough to say the least,taty carpets etc,on arrival at Shrewsbury this train became the 1730 to Manchester and left full and standing,I observed most passengers off the 175 on arrival at Shrewsbury ran for the Birmingham and Aberyswyth connections,another interesting spot was the conductor wore a badge,very formal Mrs L J.... conductor.
Ill leave the content of the meeting to Gareth.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Went to the meeting yesterday,it was well attended in the Chester room at Shrewsbury station,I was an invited guest from the Shrewsbury/Chester line.

Interesting travel to Salop from Ruabon,saves congested Wrexham town roads in the late afternoon.caught the late running 1642 ex Ruabon,this train usually goes to Cardiff,but due to work in the Newport/Cardiff area,all Holyhead/Cardiffs stop/start at Shrewsbury due to pathing,a sensible move in my opinion ,as the Holyhead/Cardiff services attract far fewer passengers compared to the Manchester/South Wales runs.
The train was a two car 175,rough to say the least,taty carpets etc,on arrival at Shrewsbury this train became the 1730 to Manchester and left full and standing,I observed most passengers off the 175 on arrival at Shrewsbury ran for the Birmingham and Aberyswyth connections,another interesting spot was the conductor wore a badge,very formal Mrs L J.... conductor.
Ill leave the content of the meeting to Gareth.

Unfortunately Mansel Williams from the Line Liaison Committee and Rail Implementation group was not there, but we did glean that that there another tt that has been drawn up different to the one that Plaid Cymru were putting about (see previous posts) which does keep most 4 car trains and coast through running in addition to extra trains apparently. The Line Liaison Committee is having its first full meeting since the announcement of extra trains on Friday so some more stuff should filter its way out.

There should be an advert out for recruiting the new Cambrian Rail Officer in the next couple of months and by all accounts he/she should have some money in the pot to spend on advertising the enhanced service as the local authorities have been contributing to the pot but with non one in post for some time.

I have reported on the latest Pont Briwet rumours on that thread.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
I have noted in the paper timetable one, This summers Sunday timetable shows trains departing Shrewsbury on the Cambrian line at 0845,the next being 1327,I was under the impression the 1126 would run,but the timetable says only from Sept 14th, pity I can not get a train into Salop from Wrexham to catch the 0845 for a Sunday day out,the 1327 is too late for me.
 

The Signalman

Member
Joined
21 Apr 2009
Messages
21
I have never seen a silver 158 on the HOWL,but thought I saw a 158 stabled at Llandod during RWS week,years ago,this May have come from Salop

Class 158 (and 159 for that matter) are only permitted between CRV and Morlais Junction when running as a class 5.

Class 175 are prohibited from using the Down platform at Llandovery.
 

berneyarms

Established Member
Joined
26 Nov 2013
Messages
3,113
Location
Dublin
I have noted in the paper timetable one, This summers Sunday timetable shows trains departing Shrewsbury on the Cambrian line at 0845,the next being 1327,I was under the impression the 1126 would run,but the timetable says only from Sept 14th, pity I can not get a train into Salop from Wrexham to catch the 0845 for a Sunday day out,the 1327 is too late for me.

It would appear that this is a typo in the NRT - apologies for giving the impression that the 1126 would in fact run during the summer.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
It would appear that this is a typo in the NRT - apologies for giving the impression that the 1126 would in fact run during the summer.

Cheers, no problem,I note ATW have not yet put up the web timetable one , colleague who is a director(NFP) at Gobowen booking office tells me they have had supplies of the paper pocket timetable one for a couple of weeks.
I may have stated elsewhere timetable one has changed,now it gives the Chester/Birmingham service at the front,Howl is now at the rear.
ATW have listened to us,we always considered timetable one was confusing to passengers using the line through Wrexham.
The timetable lists the Sunday 0845 as D runs to 7th Sept,the 1126 is G runs from 14th Sept.
Bob
 
Last edited:

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Class 158 (and 159 for that matter) are only permitted between CRV and Morlais Junction when running as a class 5.

Class 175 are prohibited from using the Down platform at Llandovery.

158s can run attached to another permitted unit as long as it is locked out of passenger use. This was proved in 2007 when the Signalling work at Port Talbot overran by 4 days. It was the only was to get them in and out of West Wales.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Posted on the Gerald thread in allocations and timetables apparently LHCS diagram on North a Wales coast starting Dec14. Note the current 4 car 158 diagram 0740 off Chester becomes LHCS. There's the units for Cambrian enhanced in May 15?

Quote:
Originally Posted by The Planner
My sources tell me the test run is June 8th and apparently the Dec 14 diagram starts/ends at Crewe.
Quoted elsewhere -

1D51 0716 Crewe - Chester
1H82 0740 Chester - Manchester Piccadilly
1D34 0950 Manchester Piccadilly - Holyhead
1H89 1259 Holyhead - Manchester Piccadilly
1D31 1650 Manchester Piccadilly to Llandudno
2D79 1913 Llandudno - Llandudno Junction
2D80 1928 Llandudno Junction - Llandudno
1K96 1938 Llandudno - Crewe
__________________
http://www.flickr.com/photos/chester025/
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
Posted on the Gerald thread in allocations and timetables apparently LHCS diagram on North a Wales coast starting Dec14. Note the current 4 car 158 diagram 0740 off Chester becomes LHCS. There's the units for Cambrian enhanced in May 15?

Quote:
Originally Posted by The Planner
My sources tell me the test run is June 8th and apparently the Dec 14 diagram starts/ends at Crewe.
Quoted elsewhere -

1D51 0716 Crewe - Chester
1H82 0740 Chester - Manchester Piccadilly
1D34 0950 Manchester Piccadilly - Holyhead
1H89 1259 Holyhead - Manchester Piccadilly
1D31 1650 Manchester Piccadilly to Llandudno
2D79 1913 Llandudno - Llandudno Junction
2D80 1928 Llandudno Junction - Llandudno
1K96 1938 Llandudno - Crewe
__________________


Long suffering commuters will welcome the 0740 to Manchester and the 1650 to Chester & Nth Wales with extra carriages, I presume Welsh Gov will be paying for the hiring in of mark3s/DVT and class 67.
 
Last edited:

kieron

Established Member
Joined
22 Mar 2012
Messages
3,283
Location
Connah's Quay
I notice that the 0950 and 1259 appear to be altered services (the 0950 running in place of a Llandudno train, the 1259 one from Bangor).

Do you know what other changes Arriva (and Virgin, if they've have a chance yet) plan to accommodate these?
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
ATW changes not gone out to stakeholders yet, although imminent.
--- old post above --- --- new post below ---
I notice we have started discussing this on this thread, but the bulk of the discussion is on the "ATW Gerald" thread.
 

The Informer

Member
Joined
2 May 2011
Messages
344
Location
Roy's Rolls Cafe
Just for the record...
The Down loop at Welshpool is now operational. Down Trains have been using it since Saturday. There is a 50 mph restriction on it to aid consolidation of the recently completed works.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Just for the record...
The Down loop at Welshpool is now operational. Down Trains have been using it since Saturday. There is a 50 mph restriction on it to aid consolidation of the recently completed works.

There's a NR 97 and a short rake of Seacows running from Coleham down to Aberystwyth on driver training runs this week that have been using it. The dovey Junction loop has had use as well.

Refurbishment of Aberystwyth station has also started sign up saying toilets out of action till end of September and to go to Wetherspoons instead!
Still TSR on Talerddig bank between Bells Bridge and cutting by milepost 62.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Welshpool Dynamic loop DOWn side in use on Tuesday 20th May with 158841 leading 1409 BHM INTl to Aberystwyth/Harlech past Cilcewydd Mill.
 

Attachments

  • G Mobile May 21 Trains 011.jpg
    G Mobile May 21 Trains 011.jpg
    230.8 KB · Views: 47

the-gog

Member
Joined
30 Nov 2005
Messages
115
There's a NR 97 and a short rake of Seacows running from Coleham down to Aberystwyth on driver training runs this week that have been using it. The dovey Junction loop has had use as well.

Refurbishment of Aberystwyth station has also started sign up saying toilets out of action till end of September and to go to Wetherspoons instead!
Still TSR on Talerddig bank between Bells Bridge and cutting by milepost 62.

The driver training runs have been going to Tywyn. They went to Aberystwyth a week last Monday, and Tywyn on Wednesday and Thursday. It got terminated at Mach on Tuesday and Friday, running back to Coleham. It appears it ran to Aberystwyth Monday and Tuesday. Today, it was a tamper drag to Tywyn.

The Welshpool loop was handed back to Network Rail on Friday, 16th May, with 6Z97 using it that day to return from Mach to Coleham.

Photos of the training runs here: http://www.mylordz.com/index.php?/category/75

Richard
 
Last edited:
Status
Not open for further replies.

Top