59CosG95
Established Member
So do you think there'd be room at Cricklewood to store the sleeper rakes? Presumably all the depot roads are electrifed there.
Last edited:
So do you think there'd be room at Cricklewood to store the sleeper rakes? Presumably all the depot roads are electrifed there.
So do you think there'd be room at Cricklewood to store the sleeper rakes? Presumably all the depot roads are electrifed there.
Platform heights would be a bit of a problem for putting the Sleepers in St Pancras International platforms.
Crazy idea: Put each portion (or part of, if it won't fit the whole) into a bay platform at Watford. Send each portion at a time down to Wembley to couple up to make the full train, then send north. Could even build a temporary short platform at the sidings in Wembley to allow the train (or a borrowed EMU to shuttle between Watford-Wembley a couple of times, allowing passengers to get on the train whenever) to get on the train at a reasonable time!
The sleepers can go into Kings Cross, just like they did when the WCML was being rebuilt in the late 90s.
However, it is the morning where the problems arise and as a result I don't see the sleepers ever going to St Pancras without some of these platforms being removed from the international zone.
A big consideration for me is whether the Croxley Rail Link is open in 2017, as it is currently planned to be.
If it is, then I think closing Euston in its entirety for two years would be the most sensible option.
Virgin services can terminate at Watford Junction or Milton Keynes Central. We can have a repeat of Project Rio for the Midland Main Line for Manchester passengers, to take some of the pressure off. Similarly we can see more trains extended from Edinburgh to Glasgow on the ECML, especially if the IEPs are delivered by then. The sleepers can go into Kings Cross, just like they did when the WCML was being rebuilt in the late 90s.
London Midland can split their services, perhaps running all stations and semi-fast between Queens Park (hopefully reinstating the fast line platforms in addition to the slow line platforms) and Milton Keynes, with fast trains connecting northbound at MK.
If the Croxley Link is open there will be 6tph Met line services from Watford to London, and we could also look at running Overground services via Primrose Hill to help people connect to north east London. The Bakerloo Line is one of the few tube lines in London that's not running at capacity, so having station interchanges with that line at Harrow, Wembley and Queens Park would also work.
Will the Euston rebuild take account of Crossrail 2 and possible future construction of new platforms?
It'd be a shame if there's a decades worth of major disruption only for them to realise part way through or towards the end of it that yet more major building work is needed.
Will the Euston rebuild take account of Crossrail 2 and possible future construction of new platforms?
It'd be a shame if there's a decades worth of major disruption only for them to realise part way through or towards the end of it that yet more major building work is needed.