CalderRail
Member
- Joined
- 21 Aug 2013
- Messages
- 281
Not sure if all (or any) of this has been previously posted;
http://us6.campaign-archive1.com/?u=60995e2b940263245ad65daa7&id=dbb816712a
http://us6.campaign-archive1.com/?u=60995e2b940263245ad65daa7&id=dbb816712a
On Friday 28th March, I met the Managing Director of South West Trains, Tim Shoveller, to press for action on residents concerns over congestion on the main routes via Twickenham, lack of step-free access and poor services on the loop and Shepperton line.
Tim Shovellor explained that rail travel continues to rise by 2% pa despite the recession and higher fares; so there is constant, growing pressure on an infrastructure which is now over 125 years old. He discussed with me the main planned improvements:
10 car trains to reduce congestion at peak hours are now being introduced on the Windsor line service and will be rolled out over the next year
In July, a programme will be launched for introducing 150 new carriages over the next three years, permitting all Reading as well as Windsor trains to have 10 car trains. The Hounslow loop (Whitton / Twickenham / St. Margarets) will have ten car trains next year and the Shepperton line by 2017.
Waterloo International is being brought back into service. Platform 20 is already being used occasionally, and will be in full use from 19th May. Platforms 21 and 22 will be reopened in June with a temporary bridge to the rest on the station.
Station improvements at Twickenham are set to start, initially with work on the footbridge and step-free access, in time for the Rugby World Cup.
Next is Whitton Station, subject to confirmation in June. Whitton is the number 4 out of 184 stations in line for improvements and this should now happen. St. Margarets is lower down the priority list, but with a 500+ petition behind it, I will press for early work.
Service improvements involve complex signalling adjustments but there are plans to increase frequency on the Hounslow loop on Sunday (Whitton; Twickenham; St. Margarets) and there is a good prospect of moving to a 15 minute gap between trains at Strawberry Hill by May 2015. Disappointingly the Hampton Shepperton line is unlikely to see improvements in frequency before 2017 on current plans.
To help passengers find out what is going on when services are disrupted, there is growing use of Twitter @sw_trains
There is the prospect of steady improvements in reducing congestion on the train service; with Waterloo Internation reopening, some increase in services as well, as station development at Twickenham and Whitton. This is progress but more needs to be done.
The Lib Dem team will keep campaigning for step-free access at St. Margarets station and for service improvements for Hampton.
Best Wishes
Vince Cable
MP for Twickenham