That's an option, but at less than 20 years old, still a lot of life left in the units, hence why I'm suggesting that the 222 fleet goes under a single franchise, the West Coast one, whilst the Virgin 221 fleet go to reinforce the XC franchise keeping the fleets consistent across the two rather than chopping and changing. It's not ideal, but becoming more likely.
Let's also be clear that whilst the IEP contract can supply more units, a new contract for MML/XC or even WCML would be a whole new contract that any train manufacturer could tender for, so there's just a big a chance that so something completely different would be rolled out, thus my thought on something that could be cascaded to HS2 as a classic compatable. The 220/221/222 will be with us until HS2 comes on stream, the 390 fleet may last a tad longer, the 800 fleet will be still running past the full HS2 network coming into operation.
--- old post above --- --- new post below ---
That's a very short term view, the next WCML franchise will see more routes max out in terms of train paths, so more seats on a train will become much more important than ultimate speed. The 2020's will see more routes full up, more tricks used to maximise capacity, plus intercity train purchasing focused on what will be needed post HS2 - Which will be a step change in that only Great Western and Cross Country will be the only major intercity franchises next to the HS2 franchise, as ECML and WCML become commuter/stopper focused south of the M62, and consumed into the HS2 franchise north of the M62, with MML becoming totally focused on commuter/stopper services.