There a couple of concrete rectangles that have been laid beside the track in at least two places along this line. One is just after the second tunnel out of Huddersfield west bound and is next to the west bound track. The other is between Marsden and the Standedge tunnel again next to the westbound line. Both of these are maybe 2.5m by 1.5m (I am terrible at estimating measurements) and on three sides (not the side next to the track) there are metal beams sticking up from the concrete as if they will have something attached at some point.
Anyone any idea what they are?
Anyone any idea what they are?