It seems to be accepted in the rail industry that new Diesel Multiple Units are not required as upcoming electrification works over the next six years or so prevents the need for them. This means that, of the passenger trains currently on order, the Bi-Mode IEPs are the only trains that contain diesel engines. However, there is currently a national shortage of diesel trains, a situation which was shown now Chiltern will acquire First Transpennine Expresss 9 Class 170 Turbostars. There is currently a major problem in the north with Northern Rails diesel fleet aging, a problem which is made worse by the fact that many trains are overcrowded, meaning passengers have to travel on old, uncomfortable trains in crowded conditions.
First Transpennine Express are also in desperate need of additional rolling stock. The addition of the Class 350/4s will help, but only in the short term as the loss of the Turbostars in a couple of years time will mean that, once again, they will be desperately short of rolling stock.
It annoys me when I see people claiming that compliant engines are not available and that there will be enough trains to cascade after electrification. I've seen the post by 158722 which shows that a cascade will allow the withdrawal of the Pacers, but his plan doesn't really address the issues of the requirement for extra capacity in the areas where Sprinters are being cascaded to. In my opinion, more DMUs are the only answer, and we need them far before 2024 as suggested by rolling stock plans Ive seen online. As far as Im aware, passenger numbers are still on the increase, so even if there were enough DMUs to go around, we still need additional trains to increase capacity.
Im no expert on engine emissions standards (so I might be wrong here- forgive me if I am!), but Im sure compliant engines are available, contrary to belief. The 6H 1800 R83P, as used by the Class 172, has a replacement, it seems, the 6H 1800 R85. It has the same horsepower, but is complaint with EU Nonroad directive 97/68 EC, Stage IIIB (source: http://www.mtu-online.com/great-bri...nes-for-rail-traction/powerpack-for-railcars/) For larger trains, there is the QSK19-R, an underfloor rail engine meeting tier 4 final/stage IIB lower emissions, and that was revealed two years ago. (source: http://cumminsengines.com/news-pres...4+FINAL/STAGE+IIIB+LOW+EMISSIONS+AT+INNOTRANS ).
So, am I right? If so, I'm sure that new DMU's will need to be ordered within the next ten years or so to add capacity on routes that are overcrowded and, ultimately, replace the Sprinters. That is, unless the whole rail network is electrified...
Thank you
Ryan
First Transpennine Express are also in desperate need of additional rolling stock. The addition of the Class 350/4s will help, but only in the short term as the loss of the Turbostars in a couple of years time will mean that, once again, they will be desperately short of rolling stock.
It annoys me when I see people claiming that compliant engines are not available and that there will be enough trains to cascade after electrification. I've seen the post by 158722 which shows that a cascade will allow the withdrawal of the Pacers, but his plan doesn't really address the issues of the requirement for extra capacity in the areas where Sprinters are being cascaded to. In my opinion, more DMUs are the only answer, and we need them far before 2024 as suggested by rolling stock plans Ive seen online. As far as Im aware, passenger numbers are still on the increase, so even if there were enough DMUs to go around, we still need additional trains to increase capacity.
Im no expert on engine emissions standards (so I might be wrong here- forgive me if I am!), but Im sure compliant engines are available, contrary to belief. The 6H 1800 R83P, as used by the Class 172, has a replacement, it seems, the 6H 1800 R85. It has the same horsepower, but is complaint with EU Nonroad directive 97/68 EC, Stage IIIB (source: http://www.mtu-online.com/great-bri...nes-for-rail-traction/powerpack-for-railcars/) For larger trains, there is the QSK19-R, an underfloor rail engine meeting tier 4 final/stage IIB lower emissions, and that was revealed two years ago. (source: http://cumminsengines.com/news-pres...4+FINAL/STAGE+IIIB+LOW+EMISSIONS+AT+INNOTRANS ).
So, am I right? If so, I'm sure that new DMU's will need to be ordered within the next ten years or so to add capacity on routes that are overcrowded and, ultimately, replace the Sprinters. That is, unless the whole rail network is electrified...
Thank you
Ryan
If you follow the link to MTU's site above, you will be able to click on the engine models. Surprisingly, it looks like the compliant engine is quite a bit smaller than its predecessor. I don't know if that includes all the emissions cleaning gubbins though. As for Cummins, I don't think the data is available.