• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

ATW Llandudno - Manchester idea

Status
Not open for further replies.
Joined
17 Oct 2013
Messages
41
Considering most Sundays this service runs via altrincham,due to the engineering works. I wonder if arriva would ever consider running one train an hour on this route on a regular basis, calling at northwich knutsford Alty and Stockport? Could it be done?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

sonic2009

Established Member
Joined
19 Jan 2010
Messages
5,048
Location
Crewe
Don't think it would happen because there can't really be any spare paths between Stockport & Manchester Piccadilly for a start.

And if it does ever happen, not that I think it will what would replace the services via Warrington?
 

Welshman

Established Member
Joined
11 Mar 2010
Messages
3,068
And if it does ever happen, not that I think it will what would replace the services via Warrington?

In my limited experience of using the Llandudno-Manchesters, I find Warrington to be a major traffic centre with passengers changing into/from NW England & Scottish services.

The OP suggests 1tph going via the Mid-Cheshire line. At present, there is only 1tph going via Warrington, so this important interchange would be lost.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Big bureaucratic exercise. ATW have no access rights to call at stations between Chester and Stockport via Northwich. Re the paths, Northern cant even run trains through to Manchester Picc due do VT taking all the paths.
There is no point, really, as it would only mean duplicating services.
 

sonic2009

Established Member
Joined
19 Jan 2010
Messages
5,048
Location
Crewe
PHILIPE:1728618 said:
Big bureaucratic exercise. ATW have no access rights to call at stations between Chester and Stockport via Northwich. Re the paths, Northern cant even run trains through to Manchester Picc due do VT taking all the paths.
There is no point, really, as it would only mean duplicating services.

Totally agree.

Although it would be interesting to know how many paths are available between Stockport & Manchester Piccadilly, and the percentage divided to each TOC, both passenger & freight.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Totally agree.

Although it would be interesting to know how many paths are available between Stockport & Manchester Piccadilly, and the percentage divided to each TOC, both passenger & freight.

It has been suggested that VT have more than their share. Their trains increased necessitating Northerns having to be kicked out of the way.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,685
How can 3tph be more than their share?
--- old post above --- --- new post below ---
Although it would be interesting to know how many paths are available between Stockport & Manchester Piccadilly, and the percentage divided to each TOC, both passenger & freight.

Stockport to Picc is irrelevant, it is the throat of Picc and platforming that will eat capacity. You can run at 3 minute headways into and out of Picc.
 

luke1420

Member
Joined
24 Oct 2013
Messages
98
The section between Manchester and Stockport is very busy. 14 trains an hour northbound which is a train about every 4 minuets on average. Longest time with no train is 8 minuets and yes it is a 4 track line but you have got to remember when you reach Slade lane jc you get the equally busy Airport line joining. there is really no room for any more paths.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,425
Location
A typical commuter-belt part of north-west England
The section between Manchester and Stockport is very busy. 14 trains an hour northbound which is a train about every 4 minuets on average. Longest time with no train is 8 minutes and yes it is a 4 track line but you have got to remember when you reach Slade lane jc you get the equally busy Airport line joining. there is really no room for any more paths.

Not forgetting the number of paths given to the container freight services that take the Styal line.
 
Status
Not open for further replies.

Top