I think we all know which way this is going. When the 319s (?) start to arrive in the North West, the spare diesel capacity will be re-jigged across the Northern network, with Pacers starting to replace 150s / 153s, which will in turn replace 155s / 156s, which again will replace 158s. Then the spare 158 capacity will be sub-let to TPE to replace the Southbound 170s. This will be hailed as an investment in the 170 routes by the DfT as it will be the 3 car 158s that will be magically made available
..
(Come on, Im sure most people are thinking it!)
And if this isnt to be the solution, are there any other (not Pacer!) free DMUs out there that would be suitable replacements for the 170s? I was always under the impression that they were usually used (aside one or two paths) due to weight restrictions on the Selby Hull section, and regularly using 185s would cause problems?
But regardless of whatever botched solution is drawn up, this is once again another setback for the network in Northern England. Yes the Northern Hub will eventually be an improvement (subject to the Ordsall Chord approval, otherwise the jobss buggered again), but in the meantime its a potential loss in the proposed future capacity on routes that are already stretched to breaking point at times. I really wish that there was some way / will to bring forward the electrification of the full TP route to help offset some of these problems this might cause, but no doubt thats a non-starter.
A really, really cynical person might think that this was a political decision, with the current administration thinking theres not a lot of support to be gained next year along the TP corridor, but plenty to be gained in the Home Counties
.. <cough>