• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Greater Anglia Sprinter operated Footex

Status
Not open for further replies.
Joined
30 Dec 2009
Messages
480
Yesterday 23/02/014 Greater Anglia operated two Footex trains for the Tottenham vs Norwich game as Carrow Road, formed of a 5 car Sprinter in the afternoon and a 6 car Sprinter after the game.

1228 Cambridge to Norwich formed of:
156419 front + 153306 middle + 156412 rear


evening Norwich to Cambridge formed of:
153322 front + 156418 + 153306 + 156419 rear
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
I was wondering what they were using- I think there was also a second one before the match?
These were laid on because of engineering work on the GEML, and ran fast from Ely to Norwich (and return).
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
When the Norwich line is blockaded, especially on a Sunday when there's less services on the Lea Valley line, has there ever been consideration to operating through (dragged) services via Cambridge? Could the 90s power the trains at least to Cambridge if they did?
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands
When the Norwich line is blockaded, especially on a Sunday when there's less services on the Lea Valley line, has there ever been consideration to operating through (dragged) services via Cambridge? Could the 90s power the trains at least to Cambridge if they did?

Still need buses to Colchester, Ipswich, Diss etc dependant on the location of the blockade.

Nothing stops pax going via Cambridge on a 170/379 - walk up is cheaper too if you split at Cambridge! I do :D
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
A few years back the Sunday Norwich - Cambridge service was retimed so it connected better at Cambridge with the Liverpool St service, which was replatformed to platform 4 to provide a cross platform connection. This gives an hourly service which is deemed sufficient without adding the cost of running an odd hauled train via Cambridge. In addition the Lea Valley or the Southbury route could be blocked on any Sunday so pathing may not be so simple. Then there is the cost of training and retaining drivers and conductors route knowledge. Consideration was given, and rejected.
 

David Goddard

Established Member
Joined
8 Aug 2011
Messages
1,515
Location
Ely
There was a couple of Cl47 dragged peak time through trains via Cambridge when the Ipswich tunnel works were taking place some years back.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
There was a couple of Cl47 dragged peak time through trains via Cambridge when the Ipswich tunnel works were taking place some years back.

All route knowledge lost. NXEA where not interested in retaining it for Norwich crews.
 
Status
Not open for further replies.

Top