I believe it is still used between Brussels-Midi and HSL1, where the trains run on the classic Bruxelles-Paris route for about 20 kilometres.Thanks! I assume this is why the 373s had 3kV DC equipment. Do they even use that anymore?
If they might need the 3kV DC equipment in case of disruption, why did they remove the 3rd rail shoes? Should there be engineering works on the HS1, the only option is to use a route that is part of the SR 3rd rail network.
How would they access any part of the 3rd rail network to make that viable? The only possible bit I can think of would be the short stretch between Ashford and the tunnel.
There is also Fawkham Junction, located south of Ebbsfleet, that leads onto the Chatham Main Line. This was used before Phase 2 was complete.
No different to the CTRL-classic links at Ashford and Dollands Moor then?Yes, but if you leave HS1 there, you can't get to St Pancras can you?
Nope, they simply shut up shop and tell people to go home.No different to the CTRL-classic links at Ashford and Dollands Moor then?
Serious question though: if the CTRL was to be cut somewhere other than the easily bypassed Ashford-Dollands Moor segment, what would be Eurostar's BCR plans during the closure?
Loco haulage of TMST sets on some circuitous route around the blockage or all the way to St Pancras?
Loco haulage of TMST sets to some other terminal with simpler access?
Terminate services at the last available CTRL station before the blockage and provide passengers with information on making their own way there?
Nope, they simply shut up shop and tell people to go home.
Certainly, there's no way a Eurostar could be diverted off HS1 these days.